Loading...
Corners Coppell-CS 920618 CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT CORNERS OF COPPELL, LOTS 1R, 3R & 4R, BLOCK E - REPLAT P & Z HEARING DATE: June 18, 1992 C. C. HEARING DATE: July 14, 1992 LOCATION: Southeast corner of Sandy Lake Road and MacArthur Boulevard. SIZE OF AREA: 10.6984 Acres REQUEST: Approval of a replat. APPLICANT: Reklaw Partnership, Inc. Benchmark Consultants {Owner) (Engineer} Mr. Arthur Walker Mr. Roland Foerster 675 3RD Avenue, 13771N. Central Expwy. 24th Floor Suite #1011 New York, NY 10017 Dallas, TX 75243 1-800-442-1154 (214) 680-2089 HISTORY: There has been no recent zoning or platting history on this parcel. TRANSPORTATION: MacArthur Boulevard is an improved 4-lane divided thoroughfare (subject to widening to six lanes in the future), P6D contained within a 100-110 foot right-of-way. Sandy Lake Road is proposed to be a C4D/6 - a four-lane divided thoroughfare within a six lane right-of-way (100-110 feet); it is currently a two lane road. SURROUNDING LAND USE & ZONING: North - existing commercial uses: C & R South - existing apartments: MF-1 East - vacant: R West - developed single-family; TH-1 COMPREHENSIVE PLAN: The Comprehensive Plan shows commercial uses for this parcel. ITEM 9 ANALYSIS: As stated in the letter attached, the owner feels Greater potential for use of this property exists if it can be replatted into three parcels. The owner has concluded that an office use appears more viable than the existing strip center, and that by resubdividinG into three lots, thus reducing the total leasable square footage in each parcel, a much more attractive product results. As proposed, each new lot will contain sufficient parking for the individual parcel, and the applicant understands that separation walls dividing this structure into 3 components will require adherence to the Uniform Building Code. Because this alteration still meets the use proposed by the Comprehensive Plan, the owner clearly understands the parking requirement provisions, and because the owner is amenable to the fire separation walls required by Code, staff recommends approval of this replat subject to noting on the plat the finished floor elevations of the structure, an agreement to maintain in a healthy and Growing condition all landscaping on the property, and desiGnatinG the plat document as a "Rep!at of Corners of Coppell Subdivision". ALTERNATIVES: 1) Approve the replat 2) Deny the replat 3) Modify the replat ATTACHMENTS: 1) Replat 2) Letter dated May 11, 1992 from Stephen C. Hundley, AIA CORNERS.STF May 11, 1992 Mr. Gary Sieb Director of Planning and Community Services CITY OF COPPELL P.O. Box 478 Coppell, Tx. 75019 Re: Corners of Coppell/Pecan Tree Plaza Dear Mr. Sieb: Per our conversation this morning I am writing this letter to summarize our conversation concerning the replat of the above mentioned property. It is the intent of the Owner of the property, Blue Chip Properties, to replat the property for the purpose of giving the Owner the flexibility to sell portions of the center to individual buyers. After exhaustive retail viability studies of the site the Owner has concluded the site is more suitable to a high tech office park use and is aggressively pursuing this type of user. The following represent the observations I offered this morning: 1. Under current zoning, this type of use, (office) can be qualified as upzoning where the use will require even less parking than that of retail. 2. Furthermore, each individual lot will contain sufficient parking for that lot. There will however, be the need for simple cross access agreements for internal circulation. However, this is not unusual and is quite common in developments where properties abut one another and internal circulation crosses between properties. 3. Additionally, under current zoning the zoning allows zero yard setbacks within the total project. Under this provision, if users purchased individual tracts, the Owner would be compelled to install area separation walls along the property lines to satisfy provisions of the Uniform Building Code for area separation requirements. The Owner is quite amendable to making these modifications if and when a user is intending to occupy the building as a function of a sale of the individual parcel. I think it is important to note, Blue Chip Properties is currently spending funds to correct deficiencies in the current fire protection system within the project. Additionally, they are preparing to launch a significant advertising campaign to increase the market visibility of the project. Each of these actions signifies the Owner's desire to convert an empty shell sitting on the outskirts of Coppell for the last several years into a useful, functioning property which will in mrn generate much needed jobs and housing within Coppell and additional tax revenues for the City. ?'~,R[X.[:R~ ~N -\RC',-tlTECTLR[ 20i9 N. L.\~.~&R. -LITF 230 D-'.~[ I &q. 75\ \q 73202 Page - 2 As the original Architect for the project we are also excited about the possibility of one of our projects becoming revitalized and utilized. The project is far too attractive to remain a "see through" building. If you have any questions or ifI can be of any further assistance, please do not hesitate to call. Sincerely, Stephen C. Hundley AIA President cc: Arthur Walker