Loading...
Westhaven Addition Ph-140522 DEVELOPMENT FEE TABLE Project:750 Westhaven (fountain meter) Date: 5/22/2014 TOTALAMOUNT DUE FEES DUEPRIOR TO FILING PLAT Water Impact Fee$4,797.00 (100% due at Issuance of Building Permit) Water Tap Inspection Fee$0.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic)$882.00 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline)$0.00 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic)$30.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit$0.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee$4,797.00 (100% due at Issuance of Building Permit) Wastewater Tap Inspection Fee$0.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee$50.00 (100% due at Issuance of Building Permit) Park Fee$0.00$0.00 (100% due prior to Filing Plat) Roadway Impact Fee$0.00$0.00 (100% due prior to Filing Plat) Street Light FeeInformation not Available (100% due prior to Acceptance of Project) Street Sign FeeInformation not Available (100% due prior to Acceptance of Project) Construction Inspection FeeInformation not Available (100% due prior to Start of Construction) TOTAL$10,556.00 TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT $0.00