ST9902-CS120601 (2) Halie Hernandez From:Williams, Bryan <Bryan.Williams@oncor.com> Sent:Friday, June 01, 2012 9:47 AM To:Keith Marvin; Matt Kinsey Cc:Kenneth Griffin; James Cumbee; Keith Von Kohn; Chris B. Seely Subject:RE: Sandy Lake Rd - Transmission Poles Keith, We will initiate the survey. We can address relocation of facilities in the agreement. There should be satisfactory clearance above underground utilities for safe working conditions. Thanks, Bryan Williams, P. E. Consulting Engineer, TPM Oncor Electric Delivery Company 115 W. 7th Street Fort Worth, Texas 76102-7033 P. O. Box 970 Fort Worth, Texas 76101-0970 Tel.: 817.215.6285 Fax.: 817.215.6274 From: Keith Marvin [mailto:kmarvin@coppelltx.gov] Sent: Friday, June 01, 2012 9:15 AM To: Williams, Bryan; Kinsey, Matt Cc: Ken Griffin; Von Kohn, Keith; Chris B. Seely Subject: RE: Sandy Lake Rd - Transmission Poles Thanks Bryan. I see no reason why you could not proceed with the easement survey. We will need to talk more about the logistics of relocating portions of our 24" water line to accommodate these poles. DO you envision covering that in the language of the agreement? Is it safe to assume that there will be adequate clearance under your wires for us to excavate and repair this water line if necessary? Thanks, Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> "Williams, Bryan" <Bryan.Williams@oncor.com> 5/30/2012 10:03 AM >>> 1 Keith, Thanks for reviewing our proposed alignment along Sandy Lake Road. See below in red for response to your questions. With your approval, Oncor would like to survey the proposed route for preparation of the easement. We will adjust the line to avoid the conflicts that you have referenced. Please let us know if you concur and we will proceed accordingly. Sincerely, Bryan Williams, P. E. Consulting Engineer, TPM Oncor Electric Delivery Company 115 W. 7th Street Fort Worth, Texas 76102-7033 P. O. Box 970 Fort Worth, Texas 76101-0970 Tel.: 817.215.6285 Fax.: 817.215.6274 From: Keith Marvin [mailto:kmarvin@coppelltx.gov] Sent: Wednesday, May 16, 2012 5:08 PM To: Williams, Bryan; Kinsey, Matt Subject: Fwd: Sandy Lake Rd - Transmission Poles Matt/Bryan, I took the transmission alignment that Matt sent me and had our consultant lay it out on our Sandy Lake Road plans. See the attached PDF (attachment removed due to size). We have a few observations: 1. It appears a few of the pole locations may conflict with an existing 24" water line that belongs to the city. We will adjust the line to avoid these conflicts. If necessary, Oncor will reimburse the City for relocating the water line during construction of the line. 2. There may be conflicts with some existing franchise utilities in the alignment as well. Oncor intends to avoid the gas pipeline at the structure locations. The presence of the gas line under our line cannot be avoided. Oncor will reimburse other franchise utilities if relocation of their facilities is necessary. 3. It appears some of the poles fall outside the city owned right of way. In many of these cases they fall within a platted utility easement. Does Oncor have the right to install transmission towers within this easement, or are you asking the city to convey that right to you as part of this agreement? All structures should be within City controlled land. Our franchise agreement should allow the placement of structures within utility easements. 4. Assuming we agree on locations for these poles, and we execute all necessary agreements, how do we preserve these locations for your future use? Oncor does not expect the City to preserve the structure locations. If conflicts arise during construction, Oncor will reimburse as necessary. We look forward to discussing these issues, and any others needed to move forward with the removal of the existing line. Thanks, 2 Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> "Chris B. Seely" <cseely@tnp-online.com> 5/16/2012 3:47 PM >>> Keith: Attached are exhibits showing the Oncor Transmission Pole and overhead transmission lines alignment per the color exhibit we received on 4/18. I have noted the conflicts with the existing utilities. The transmission lines are over the top of the 24” water line for approximately 1,800 feet from Cottonwood Drive to Oak Trail. It is also over the top of the existing gas lines east of Oak Trail. I have not reviewed any solutions to these conflicts as of yet. Chris Chris Seely, P.E. (TX) Project Manager TEAGUE NALL AND PERKINS, INC . 17304 Preston Road Suite 1340 Dallas, Texas 75252 214.461.9867 phone 214.461.9864 fax cseely@tnp-online.com www.tnp-online.com Confidentiality Notice: This email message, including any attachments, contains or may contain confidential information intended only for the addressee. If you are not an intended recipient of this message, be advised that any reading, dissemination, forwarding, printing, copying or other use of this message or its attachments is strictly prohibited. If you have received this message in error, please notify the sender immediately by reply message and delete this email message and any attachments from your system. Confidentiality Notice: This email message, including any attachments, contains or may contain confidential information intended only for the addressee. If you are not an intended recipient of this message, be advised that any reading, dissemination, forwarding, printing, copying or other use of this message or its attachments is strictly prohibited. If you have received this message in error, please notify the sender immediately by reply message and delete this email message and any attachments from your system. 3