ST9902-CS121114
Halie Hernandez
From:Keith Marvin
Sent:Wednesday, November 14, 2012 7:59 AM
To:Andrew Luce
Subject:Re: info for underground
Thanks Andrew.
Keith Marvin, P.E.
City of Coppell
On Nov 13, 2012, at 8:43 PM, "Andrew Luce" <ALuce@TNPINC.com> wrote:
Don,
Below is a summary of the depths you are requesting:
The flow line for the proposed storm drain will be at 488.16, correlating to an approximate depth of 3.5’
+/- below existing ground.
I have attached the City’s record drawings for the 24” water line in this area.
The gas line shown in your plans is existing and was not included in the Atmos relocation plans for this
project. I do not have detailed plans showing the depth of this line. You will have to contact Atmos for
exact location/depth of this line. There is another gas line crossing S. Coppell Rd. further north that was
installed with the relocations. I have attached the sheets pertaining to this area. Because Teague Nall
and Perkins was not involved with the design or construction of the line, you will need to verify with
Atmos the actual elevation that it was installed at.
Please let me know if you have any further questions.
Thanks,
Andrew
From: Keith Marvin [mailto:KMarvin@coppelltx.gov]
Sent: Monday, November 12, 2012 3:00 PM
To: Andrew Luce
Subject: FW: info for underground
Andrew,
Can you please provide Don Roundtree with the information he is requesting.
Don,
Feel free to call Andrew with design questions relative to W. Sandy Lake Road.
1
Andrew Luce, P.E.
Project Manager
1100 Macon Street
Fort Worth, Texas 76102
817.336.5773 Main
817.665.8208 Direct
817.336.2813 Fax
aluce@tnpinc.com
Thanks.
Keith Marvin, P.E.
City of Coppell
972-304-3681
From: Don Roundtree [mailto:don@tandem-consulting.net]
Sent: Monday, November 12, 2012 8:48 AM
To: Keith Marvin
Cc: Lynn Brown; Kyle Capps
Subject: info for underground
Keith, we are preparing relocation plans for permitting and construction of the Coppell ISD fiber
on Sandy Lake. I have attached a sheet from our plan set for coordination purposes. Are you
able to provide any information that will help us determine the plan / profile requirements for the
proposed underground replacement shown on this sheet?
Thanks,
Don Roundtree, CSI, CDT
Tandem Consulting, LLC
903-439-7217
http://www.tandem-consulting.net/
<Atmos Relocation Plans.pdf.pdf>
<24 Inch WL Record Drawing.pdf>