Loading...
ST9902-CS130222 (3) Halie Hernandez From:Chris Schmitt <cschmitt@tnpinc.com> Sent:Friday, February 22, 2013 2:32 PM To:Keith Marvin Cc:Chris Schmitt; Kyle Dykes Subject:Re: Sandy Lake Phase 2A and 2B outstanding questions Keith I received your message and tried to catch you in the office. Ill work around our meeting with Dykes. Let me know your availability next week and well figure out best time. Thanks Chris tnp teague nall & perkins Chris Schmitt, P.E. Principal 17304 Preston Road, Suite 1340 Dallas, Texas 75252 214.461.9867 Main 903.421.1897 Mobile 214.461.9864 Fax cschmitt@tnpinc.com On Feb 22, 2013, at 9:44 AM, "Keith Marvin" <KMarvin@coppelltx.gov> wrote: Chris, I'm in a meeting now that should be done by 10:30. You can come by this morning, or I'm open on Monday or Tuesday after 10:00. Keith Marvin City of Coppell On Feb 22, 2013, at 9:45 AM, "Chris Schmitt" <cschmitt@tnpinc.com> wrote: Keith, My son is playing in a basketball tournament today in Frisco. Our first game is at 1:00 and next will depend on whether they win or lose thus my schedule is in flux for the remainder of the day. 1 If you can fit me in I can stop by this morning or stop by late in the day or we can schedule a time for first of next week. Thanks Chris <image001.jpg> Chris Schmitt, P.E. Principal 17304 Preston Road, Suite 1340 Dallas, Texas 75252 214.461.9867 Main 903.421.1897 Mobile 214.461.9864 Fax cschmitt@tnpinc.com From: Keith Marvin [mailto:KMarvin@coppelltx.gov] Sent: Wednesday, February 20, 2013 12:10 PM To: Chris Schmitt Cc: Casey McBroom; Chris Schmitt; Kyle A. Bennett; Andrew Luce Subject: Re: Sandy Lake Phase 2A and 2B outstanding questions Yes. Let's get together to discuss it. I've got some time Friday afternoon this week. Keith Marvin City of Coppell On Feb 20, 2013, at 11:46 AM, "Chris Schmitt" <cschmitt@tnpinc.com> wrote: Thanks Keith Also, I'm sure you are busy but wanted to see if you've had any time to review 121 water line proposal I sent last week? Chris tnp teague nall & perkins Chris Schmitt, P.E. Principal 17304 Preston Road, Suite 1340 Dallas, Texas 75252 214.461.9867 Main 903.421.1897 Mobile 214.461.9864 Fax cschmitt@tnpinc.com 2 On Feb 20, 2013, at 11:39 AM, "Keith Marvin" <KMarvin@coppelltx.gov> wrote: Casey, Let me work on some answers and get back to you. Keith Marvin, P.E. City of Coppell 972-304-3681 From: Casey McBroom [mailto:CMcBroom@TNPINC.com] Sent: Tuesday, February 19, 2013 11:08 AM To: Keith Marvin Cc: Chris Schmitt; Kyle A. Bennett; Andrew Luce Subject: Sandy Lake Phase 2A and 2B outstanding questions Keith We met internally yesterday to discuss both phases of the Sandy Lake project, and developed a list of remaining questions that we wanted to run by you prior to our final submittals. Some of these may be simple answers while others you may wish to meet to discuss. We are open to whatever works best for you. As previously discussed, our hope was to have plans to you by the end of the month, possibly sooner if we can gather all the remaining information we need. Take a look, and feel free to respond to the items as you see fit. Thanks. 1.We need a copy of the City Bridge Luminaire Details so we can complete the bridge lighting plans. 2.Does the City have a specific modular block Brand/Type/Color that they would like for us to specify on the plans at this time? There have been some previous examples mentioned around the city, but we have never identified exactly what colors/look would be preferred. This can also be handled later through submittals if preferred. 3.Does the City have a preference on pedestrian handrail Color/Type in lieu of the less appealing PR-1/PR-2 types? One thought would be a more decorative handrail with a black or wrought iron look. Again, this could be handled 3 through submittals if necessary, but would help the contractors in pricing if we detailed it out prior to bidding. 4.Would the City like to extend the Bridge Railing on the west side of the bridge, south side of the road, instead of using the selected pedestrian handrail type? We had discussed the possibility of extending the bridge railing rather than having two different types abutting each other. 5.Phase 1 had permanent “paint” markings (stripes, arrows, etc.) paid as lump sum, but had traffic buttons paid by type/each. Would they prefer to do that again? We noticed this while putting together our list of bid items, and while unconventional, we can certainly do this again. 6.Would the City prefer that TNP submit (for City review) some form liners for the cast-in-place concrete retaining walls prior to bidding, or would they prefer to handle that through submittals with the contractor? 7.Would the City prefer that the trail improvements be included in the plan set for Phase 2A prior to bidding, or submitted as an addendum once available? Since scope, fee, etc. is still being finalized, we anticipate a slight delay in this portion of the plans. 8.After reviewing the Geotechnical report in detail, cement stabilized subgrade is recommended for the entire 2A and 2B sections. Previous conversations left open the possibility of dividing the necessary quantity of stabilization into both lime and cement, and requiring further series testing during construction. Is this still the city’s recommendation, or is the recommendation from the report acceptable? 9.We would like to get the revised Denton Tap Signal Plans which the City is currently preparing. If requested, we can provide the proposed paving and ramp cad work for incorporation into the City’s drawings. 10.We need the water service line size of the Verizon building for reflection in our drawings. 4 11.Has there been any update or changes to the desired submittal/bidding schedule? As mentioned above, our goal was to deliver plans by the end of the month with expectations that advertising would follow shortly, but we can adjust that schedule as the City sees necessary. Thanks for your help, and we hope to have everything completed very shortly. Please let us know if you would like to discuss any of these items further, or if there is anything that you have thought of since we last met. <image001.jpg> Casey McBroom, P.E. Project Engineer 17304 Preston Road, Suite 1340 Dallas, Texas 75252 214.461.9867 Phone 972.900.5733 Mobile 214.461.9864 Fax cmcbroom@tnpinc.com 5