Loading...
ST9902-CS130308 Halie Hernandez From:Casey McBroom <CMcBroom@TNPINC.com> Sent:Friday, March 08, 2013 10:25 AM To:Keith Marvin Cc:Chris Schmitt Subject:RE: Sandy Lake Geotech Report Keith Just wanted to clarify one thing. Chris an I heard two different things at the last meeting. Did you say you are OK using a lower lbs/sy number for cement stabilization (i.e. 32 lbs) if the report calls for it, or would you prefer to bump that number up to 42lbs as is the City go-to standard? Thanks. Casey McBroom, P.E. Project Engineer 17304 Preston Road, Suite 1340 Dallas, Texas 75252 214.461.9867 Phone 972.900.5733 Mobile 214.461.9864 Fax cmcbroom@tnpinc.com From: Casey McBroom Sent: Wednesday, March 06, 2013 3:50 PM To: Keith Marvin <KMarvin@coppelltx.gov> (KMarvin@coppelltx.gov) Subject: Sandy Lake Geotech Report Keith Attached is the geotech report for Sandy lake road. Page 8 of the report, section 4.2 is what you are looking for. Thanks. Casey McBroom, P.E. Project Engineer 1 17304 Preston Road, Suite 1340 Dallas, Texas 75252 214.461.9867 Phone 972.900.5733 Mobile 214.461.9864 Fax cmcbroom@tnpinc.com 2