ST9902-CS130308
Halie Hernandez
From:Casey McBroom <CMcBroom@TNPINC.com>
Sent:Friday, March 08, 2013 10:25 AM
To:Keith Marvin
Cc:Chris Schmitt
Subject:RE: Sandy Lake Geotech Report
Keith
Just wanted to clarify one thing. Chris an I heard two different things at the last meeting.
Did you say you are OK using a lower lbs/sy number for cement stabilization (i.e. 32 lbs) if the report calls for it, or would
you prefer to bump that number up to 42lbs as is the City go-to standard?
Thanks.
Casey McBroom, P.E.
Project Engineer
17304 Preston Road, Suite 1340
Dallas, Texas 75252
214.461.9867 Phone
972.900.5733 Mobile
214.461.9864 Fax
cmcbroom@tnpinc.com
From: Casey McBroom
Sent: Wednesday, March 06, 2013 3:50 PM
To: Keith Marvin <KMarvin@coppelltx.gov> (KMarvin@coppelltx.gov)
Subject: Sandy Lake Geotech Report
Keith
Attached is the geotech report for Sandy lake road. Page 8 of the report, section 4.2 is what you are looking for. Thanks.
Casey McBroom, P.E.
Project Engineer
1
17304 Preston Road, Suite 1340
Dallas, Texas 75252
214.461.9867 Phone
972.900.5733 Mobile
214.461.9864 Fax
cmcbroom@tnpinc.com
2