Freeport 2R Blk 3-140530
DEVELOPMENT FEES
PROJECT NAME: Freeport North, Lot 2R Blk 3
ENGINEER:
ORIGINATION DATE:30-May-14
SENTASSESSMENTASSESSED FEEAMOUNT PAID DATE
Water Impact Fee$11,844.00
Wastewater Impact Fee$4,797.00
Park Fee
Roadway Impact-Zone$12,000.00
Street Sign
Street Light
Construction Inspection
EG or Bore Permit
Overtime Inspection
Water Tap Inspection$150.00
Wastewater Tap Inspection$50.00
Water Meter (Domestic)$882.00
Water Meter (Fire/Irrig)$882.00
Meter Deposit (Domestic)$30.00
Meter Deposit (Fire/Irrig)$60.00
Utility Final Inspection$50.00
Subtotal to Eng.$12,000.00$0.00$12,000.00
Total FeesFees PaidAmount Owed
TOTALS
$30,745.00$0.00$30,745.00
NOTES
Prior To ConstructionDate ReceivedPrior To Final Acceptance
Erosion Control ApprovedAs Built Plan Recd.
E.P.A.-N.O.I. Recd.Paving Bond Recd.
Const. Plan ApprovedUtilities Bond Recd.
Erosion Control Maint.