Loading...
Creekview II L3-CS001106 (2) CONSULTING ENGINEERS, INC. November 6, 2000 Mr. Michael Martin~ P.E. City of Coppell 255 Parkway Boulevard Coppell, Texas 75019 RE: Creekview 2 Office Building l, ot 3R, Block B - Creek View PHase II Coppell, Texas NDM Job No. 00-07-091 Dear Mr Martin, Please find attached two (2) revised sets of 2nd. Submittal Plans for Subject Project. We have addressed the following items relating to your comments in a letter dated November 1, 2000. 1. An 8' wide brick paver band has been added at the existing drive entrance. The location is approximately 11.5' from the existing curb in Denton Tap Road.(approximately 7.5' inside property line). This required removing 4.0' of existing concrete pavement at the entrance. 2. Silicone joint sealer is now shown on the Pavement Details as requested. 3. A letter requesting a variance to waive the 6" lime stabilization subgrade has been sent to Mr. Ken Griffen. 4. The outfall of Flume "A" has been directed away from the S.S.Manhole as requested. 5. Grades were adjusted near the Dumpster to avoid any fill in the 100-yr. Floodplain. Note was modified to say" no fill or grading within the 100-yr Floodplain. 6. The Fire Hydrant lead was revised to connect to the private fire line 7. Developer is aware of the retaining Wall condition imposed on the site plan. Walls are being designed by others and are shown on plans for location and grading purposes only. If you have any questions, please contact me at (214) 739-4741 or by email -(cdobeeka~ndmce.eom) The 1 st Sumbittal marked plans are returned herewith. Sincerely, NATHAN D. MAIER CONSULTING,ENGINEERS, INC. Cecil Dobecka Two NorthPark / 8080 Park Lane / Suite 600 / Dallas, Texas 75231 f (214) 739-4741