Creekview II L3-CS001101November 1, 2000
Michael Daniel, P.E.
Nathan D. Maier
Two Northpark, Suite 600
8080 Park Lane
Dallas, Texas 75231
RE: Creekview, Phase II, Lot 3R, Block B
Dear Mr. Daniel:
The City of Coppell has reviewed the referenced plans and has the following comments to offer:
1. An 8' wide brick paver band should be constructed at the driveway, 1' inside the property
line.
2. All construction joints should be sealed with silicone.
3. A letter requesting a variance to waive the 6" lime stabilization subgrade must be submitted
to the City.
4. The outfall of the proposed concrete flumes need to be directed away from the existing
sanitary sewer manholes.
5. No fill will be allowed on the floodplain without an approved Floodplain Development
Permit.
6. The proposed fire hydrant shown to be on the east side of the parking lot near the building
will need to be connected to the private fire line. See sheet #6.
7. All proposed retaining walls need to meet the condition indicated on the site plan agenda
item for this development.
There are various other minor comments throughout the plans. When all comments have been
addressed, please return these marked plans and two sets of revised plans to the City for
review. If you have any questions, please contact me at (972) 304-3681.
Sincerely,
Michael A. Martin, P.E.
Assistant City Engineer
255 PARKWAY ~r P O.BOX 4.78 ~r COPPELL TX 75OI9 1Ir TEl 972/462 0022 1Ir FAX 9'72/304 36'/3