1.I did not see an item for the monolithic median noses? Are they incidental?
2.Why is there an item for remove and replace temporary concrete barrier in the bridge items? Where and what is
it for?
3.There is an item to relocate pipe fence, but not one for the other fencing that is called out to be relocated.
Please clarify
4.General note 23 calls for temp paving to be 2” hmac and 6” flexbase. Sheet 85 calls for temp paving to be 4”
hmac and 8” flexbase. Please clarify
5.When driveways are removed and temp material may be needed for temp maintenance, can that material be
flex base or will it need to be asphalt?