ST9902-CS130419 (3) Halie Hernandez From:Casey McBroom <CMcBroom@TNPINC.com> Sent:Friday, April 19, 2013 12:19 PM To:Keith Marvin Subject:RE: Sandy Lake Contractor questions It looks like the answer to question 3 conflicts with addendum no. 1. Should I restate the language from addendum 1 so this is clear? Casey McBroom, P.E. Project Engineer 17304 Preston Road, Suite 1340 Dallas, Texas 75252 214.461.9867 Phone 972.900.5733 Mobile 214.461.9864 Fax cmcbroom@tnpinc.com From: Keith Marvin [mailto:KMarvin@coppelltx.gov] Sent: Friday, April 19, 2013 11:44 AM To: Casey McBroom Subject: RE: Sandy Lake Contractor questions Casey, Just in case you can’t see these, here are the questions on BidSync. Some have been answered, and some are outstanding. Question 1 Can you please give Engineer Estimate (Submitted: Mar 29, 2013 3:59:06 PM CDT) Answer  The estimate is $8,000,000 (Answered: Apr 1, 2013 11:27:38 AM CDT) Question 2 Is Slipform Paving machine is required to place the concrete (Submitted: Apr 1, 2013 1:24:06 PM CDT) Answer  Yes, a slip form paving machine will be required to place the roadway paving. (Answered: Apr 1, 2013 2:43:31 PM CDT) 1 Question 3 Can we submit a computer generated proposal that follow the same format as the original? (Submitted: Apr 15, 2013 2:12:52 PM CDT) Answer  No, please complete the bidform provided. (Answered: Apr 16, 2013 8:23:10 AM CDT) Question 4 Sheet 4 of Phase 2B - Typical Section for Cottonwood Drive refers to Cuty Standard 2110. This spec requires a lime treated subgrade. Should the section for this street be cement treated? (Submitted: Apr 16, 2013 2:01:29 PM CDT) Question 5 Sheet 4 of Phase 2B - Typical Section for Cottonwood Drive refers to Cuty Standard 2110. This spec requires a lime treated subgrade. Should the section for this street be cement treated? (Submitted: Apr 16, 2013 2:01:35 PM CDT) Question 6 NCTCOG section 103.4.2 requires Owners Protective Liability Insurace to be provided in addition to the General Liability. Is this policy required? (Submitted: Apr 16, 2013 2:04:13 PM CDT) Answer  Yes, this is required. (Answered: Apr 18, 2013 10:29:32 AM CDT) Question 7 The notes regarding Temporary Paving in the plans for Phase 2A calls for 2" Type D on 6" Compacted Subgrade. 2B calls for 4" Type D on 8" Flexbase. The specs calls for 2" Type B on 6" Flexbase. Which is correct? (Submitted: Apr 16, 2013 3:15:15 PM CDT) Keith Marvin, P.E. City of Coppell 972-304-3681 From: Casey McBroom [mailto:CMcBroom@TNPINC.com] Sent: Friday, April 19, 2013 9:06 AM To: Jennifer Cook Cc: Keith Marvin Subject: Sandy Lake Contractor questions Hi Jennifer Were there any last minute contractor questions from yesterday? Thanks. Casey McBroom, P.E. Project Engineer 17304 Preston Road, Suite 1340 Dallas, Texas 75252 214.461.9867 Phone 2 972.900.5733 Mobile 214.461.9864 Fax cmcbroom@tnpinc.com 3