Loading...
ST9902-CS130419 (4) Halie Hernandez From:Casey McBroom <CMcBroom@TNPINC.com> Sent:Friday, April 19, 2013 12:31 PM To:Keith Marvin Subject:RE: Sandy Lake Contractor questions OK thanks. One more thing. For pay item I-171, we state, “The cable shall be Corning AnyLan…”. We had a vendor ask if the City specifically requires that product or if they would be open to allowing the “or approved equal” language in that description. I told her I wasn’t sure, but would ask the question. Casey McBroom, P.E. Project Engineer 17304 Preston Road, Suite 1340 Dallas, Texas 75252 214.461.9867 Phone 972.900.5733 Mobile 214.461.9864 Fax cmcbroom@tnpinc.com From: Keith Marvin [mailto:KMarvin@coppelltx.gov] Sent: Friday, April 19, 2013 12:19 PM To: Casey McBroom Cc: Jennifer Cook Subject: Re: Sandy Lake Contractor questions Let me check with Jennifer and see if we can simply edit that answer. Keith Marvin City of Coppell On Apr 19, 2013, at 12:17 PM, "Casey McBroom" <CMcBroom@TNPINC.com> wrote: It looks like the answer to question 3 conflicts with addendum no. 1. Should I restate the language from addendum 1 so this is clear? 1 <image001.jpg> Casey McBroom, P.E. Project Engineer 17304 Preston Road, Suite 1340 Dallas, Texas 75252 214.461.9867 Phone 972.900.5733 Mobile 214.461.9864 Fax cmcbroom@tnpinc.com From: Keith Marvin [mailto:KMarvin@coppelltx.gov] Sent: Friday, April 19, 2013 11:44 AM To: Casey McBroom Subject: RE: Sandy Lake Contractor questions Casey, Just in case you can’t see these, here are the questions on BidSync. Some have been answered, and some are outstanding. Question 1 Can you please give Engineer Estimate (Submitted: Mar 29, 2013 3:59:06 PM CDT) Answer  The estimate is $8,000,000 (Answered: Apr 1, 2013 11:27:38 AM CDT) Question 2 Is Slipform Paving machine is required to place the concrete (Submitted: Apr 1, 2013 1:24:06 PM CDT) Answer  Yes, a slip form paving machine will be required to place the roadway paving. (Answered: Apr 1, 2013 2:43:31 PM CDT) Question 3 Can we submit a computer generated proposal that follow the same format as the original? (Submitted: Apr 15, 2013 2:12:52 PM CDT) Answer  No, please complete the bidform provided. (Answered: Apr 16, 2013 8:23:10 AM CDT) Question 4 Sheet 4 of Phase 2B - Typical Section for Cottonwood Drive refers to Cuty Standard 2110. This spec requires a lime treated subgrade. Should the section for this street be cement treated? (Submitted: Apr 16, 2013 2:01:29 PM CDT) Question 5 Sheet 4 of Phase 2B - Typical Section for Cottonwood Drive refers to Cuty Standard 2110. This spec requires a lime treated subgrade. Should the section for this street be cement treated? (Submitted: Apr 16, 2013 2:01:35 PM CDT) Question 6 2 NCTCOG section 103.4.2 requires Owners Protective Liability Insurace to be provided in addition to the General Liability. Is this policy required? (Submitted: Apr 16, 2013 2:04:13 PM CDT) Answer  Yes, this is required. (Answered: Apr 18, 2013 10:29:32 AM CDT) Question 7 The notes regarding Temporary Paving in the plans for Phase 2A calls for 2" Type D on 6" Compacted Subgrade. 2B calls for 4" Type D on 8" Flexbase. The specs calls for 2" Type B on 6" Flexbase. Which is correct? (Submitted: Apr 16, 2013 3:15:15 PM CDT) Keith Marvin, P.E. City of Coppell 972-304-3681 From: Casey McBroom [mailto:CMcBroom@TNPINC.com] Sent: Friday, April 19, 2013 9:06 AM To: Jennifer Cook Cc: Keith Marvin Subject: Sandy Lake Contractor questions Hi Jennifer Were there any last minute contractor questions from yesterday? Thanks. <image004.jpg> Casey McBroom, P.E. Project Engineer 17304 Preston Road, Suite 1340 Dallas, Texas 75252 214.461.9867 Phone 972.900.5733 Mobile 214.461.9864 Fax cmcbroom@tnpinc.com 3