Loading...
ST9902-CS130419 (5) Halie Hernandez From:Shane Pate <spate@TiseoPaving.com> Sent:Friday, April 19, 2013 3:01 PM To:Keith Marvin; cschmitt@tnp.com Cc:cmcbroom@tnpinc.com Subject:sandy lake The item description in the spec book for the pond states to drain the pond along with several other specific things to do. In the pre-bid it was said that the work would only be around the headwall and pipe. Can you please clarify what exactly we will need to do because the way it is specd could be very expensive. Thanks Shane Pate Estimator- Tiseo Paving Company (972-289-0723)Office (972-216-5637)Fax (469-446-6532)Cell 1