ST9902-CS130422
Halie Hernandez
From:Casey McBroom <CMcBroom@TNPINC.com>
Sent:Monday, April 22, 2013 8:34 AM
To:Keith Marvin
Subject:RE: Sandy Lake Addendum No. 2 - Draft
Yes, I’m reading it now.
Casey McBroom, P.E.
Project Engineer
17304 Preston Road, Suite 1340
Dallas, Texas 75252
214.461.9867 Phone
972.900.5733 Mobile
214.461.9864 Fax
cmcbroom@tnpinc.com
From: Keith Marvin [mailto:KMarvin@coppelltx.gov]
Sent: Monday, April 22, 2013 8:32 AM
To: Casey McBroom
Subject: Re: Sandy Lake Addendum No. 2 - Draft
I just marked up the one I had and sent it to you. Did you get that?
Keith Marvin
City of Coppell
On Apr 22, 2013, at 8:31 AM, "Casey McBroom" <CMcBroom@TNPINC.com> wrote:
Here you go Keith. Sorry, I had to leave the office a little early on Friday.
<image002.jpg>
Casey McBroom, P.E.
Project Engineer
17304 Preston Road, Suite 1340
Dallas, Texas 75252
214.461.9867 Phone
972.900.5733 Mobile
214.461.9864 Fax
cmcbroom@tnpinc.com
1
From: Keith Marvin [mailto:KMarvin@coppelltx.gov]
Sent: Friday, April 19, 2013 3:51 PM
To: Casey McBroom
Subject: RE: Sandy Lake Addendum No. 2 - Draft
Casey,
Can you send me the word version of this so I can make some changes and send it back?
Keith Marvin, P.E.
City of Coppell
972-304-3681
From: Casey McBroom [mailto:CMcBroom@TNPINC.com]
Sent: Friday, April 19, 2013 3:02 PM
To: Keith Marvin
Subject: Sandy Lake Addendum No. 2 - Draft
Keith
Attached is the draft for addendum no. 2. I believe we have covered just about every question with the
exception of a few items which are highlighted in red.
I’ve also left a few responses in red for items that we have answered, but I wanted to draw specific
attention to you for your input.
The revised sheets have not all been turned in to me yet, but I expect most of those by the end of the
day.
We will very likely re-issue the entire bid proposal form since so many quantities have slightly changed
as a result of further QA/QC. We’ve even had to add at least one pay item.
Monday, I would expect the final addendum will contain:
The addendum summary (7-8 pages)
Several full size plan sheets (5-10 full size sheets)
Revised proposal form (70 pages for 2A and 2B)
Please take a look at it, and feel free to comment on anything you see that you would like revised. I will
send you a final draft as soon as I can on Monday so you can see the final version we plan to release.
Thanks.
<image003.jpg>
Casey McBroom, P.E.
2
Project Engineer
17304 Preston Road, Suite 1340
Dallas, Texas 75252
214.461.9867 Phone
972.900.5733 Mobile
214.461.9864 Fax
cmcbroom@tnpinc.com
<Draft - Addendum No. 2.docx>
3