WA9302A-CS 970228 SHIMEK, JACOBS & FINKLEA, L.L.P. CONSULTING ENGINEERS 8333 Douglas Avenue, #820 Dallas, Texas 75225-5816 Fax (214) 361-0204 Phone (214) 361-7900 ROSS L. IACOBS, P.E. RONALD V. CONWAY, P.E. JOHN W. BIRKHOFF, P.E. JOE n. CANTER, P.E. February 28, 1997 GARY C. HENDRICKS, P.E. I. C. FINKLEA, P.E. Mr. Kenneth M. Griffin, P.E. City of Coppell Post Office Box 478 Coppell, Texas 75019 Re: Village Parkway Pump Station Additions Proposed Change Order No. 4 & 5 Dear Mr. Griffin: We are enclosing two copies of proposed Change Orders No. 4 & 5 to the City' s contract with North Texas Municipal Construction Co. for the construction of the Village Parkway Pump Station Additions. Change Order No. 4 adds several items that have been identified during construction as needed on the project, yet not included in the original scope of the project. Change Order No. 5 adds components to the SCADA System as requested by the City. Both change orders more specifically describe the extra work proposed. Change Order No. 4 adds $2,991.00 to the contract amount which represents less than a 1/2% increase in the original contact amount. Change Order No. 5 totals $8,960.00, or an approximate 1% increase in the original contract amount. To date the total of all change orders on the project, including proposed Change Order No. 4 & 5, is $162, 158.00 or approximately 17.38% of the original contract amount. As a reminder, Change Order No. 2 added the SCADA System to this project and totaled $152,739.00 Please review the proposed change orders and notify us of your findings. The general contractor has stated he is ready to complete the project within the next few weeks if we can get these outstanding issues resolved. We are available to discuss this project further at your convenience. Enclosure cc: Mr. Larry Davis CITY OF COPPELL, TEXAS VILLAGE PARKWAY PUMP STATION ADDITION PROJECT NO. WA-9302 BID NO. Ql195-02 CHANGE ORDER NQ, 4 A. INTENT OF CHANGE ORDER The intent of this change order is to modify the provisions of the contract entered into by the City of Coppell, Texas and North Texas Municipal Construction, Inc., 5614 Dyer Street, Dallas, Texas 75206, for construction of the Village Parkway Pump Station Addition, dated January 9, 1996. B. DESCRIPTION OF CHANGE The City of Coppell desires to add the following additional items to the Village Parkway Pump Station Additions Project. These items were not included in the original scope of contract work: a) Furnishing and Installing lighting at the control panel for the disinfection system. The attached memo dated January 17, 1997 from MrCreary & Associates specifies the work and equipment required. b) Furnishing and installing Support System for the Cone Valves as shown on the attached Exhibit dated December 4, 1996 c) For Eliminating the staircase to the motor control center platform and modify the two access ladders to be no further than 8-inches from the edge of the platform. This work also includes the addition of a handrail across the opening at the original ladder location. d) For furnishing and installing insulation for the exposed chemical feed solution, sampling and waterlines at the disinfection facility. e) For furinshing and installing power feed to the overhead door opener. f) For furnshig and installing 4" diameter, liquid filled pressure guages on the discharge headers of Pumps No. 5 & 6. J:\Copp~tl\94156\Co_no4.doe Page I of 2 City of Coppell ~ ~ Village Parkway Pump Station Add~ .... ts Change Order No. 4 C. EFFECT OF CHANGE ON CONTRACT AMQUNT This change will have the following affect on the final contract amount: Original Revised Change Revised Item Contract Contract Order Unit Contract No. Description Units Quantity Quantity Price Amount 20 For fumishing and installing lighting at the L.S. 0 1 $472 $472 Disinfection System Control Panel 21 For furnishing and installing supports for the L.S. 0 1 586 586 modified cone valve configuration 23 For modifying the motor control center L.S. 0 1 327 327 platform access ladders and handrail 24 For fumishing and installing insulation on the L.S. 0 1 883 883 exposed piping at the Disinfection Facility 25 For providing power feed to the overhead door L.S. 0 1 530 530 26 For adding two pressure gauges on the pump L.S. 0 1 193 193 discharge line Total Amount of Change I I I $2,991 Original Contract Amount $933,000.00 Amount, Change Order No. 1 (5,000.00) Amount, Change Order No. 2 152,739.00 Amount, Change Order No. 3 2,468.00 Amount, Change Order No. 4 $2,991 Revised Contract Amount $1,086,198.00 D. EFFECT OF CHANGE ON CONTRACT TIME The changes identified above has no effect on the revised contract time. Original Contract Time: 300 Calendar Days Calendar Days, Change Order No. 1 0 Calendar Days Calendar Days, Change Order No. 2 60 Calendar Days Calendar Days, Change Order No. 3 0 Calendar Days Calendar Days, Change Order No. 4 30 Calendar Days Revised Contract Time 390 Calendar Days J:\Coppell\94156\Co_no4.doe Page 2 of 2 City of Coppell Village. Parkway Pump Station Addi. ,s Change Order No. 4 By the signatures below of duly authorized agents, the City of Coppell, Texas and North Texas Municipal Construction Company, Inc., do hereby agree to append this Change Order No. 4 to the original contract between themselves, dated January 9, 1996. City of Coppe!l, Texas North Texas Municipal Construction Company, Inc. Owner Contractor By: By: D ate: D ate: Attest: Attest: J:\Coppell\94156\Co_no4.doc Page 3 of 2 CITY OF COPPELL, TEXAS VILLAGE PARKWAY PUMP STATION ADDITION PROJECT NO. WA-9302 BID NO. Q1195-02 CHANGE ORDER NO, 5 A. INTENT OF CHANGE ORDER The intent of this change order is to modify the provisions of the contract entered into by the City of Coppell, Texas and North Texas Municipal Construction, Inc., 5614 Dyer Street, Dallas, Texas 75206, for construction of the Village Parkway Pump Station Addition, dated January 9, 1996. B. DESCRIPTION OF CHANGE The City of Coppell has requested the following additions or modifications to the SCADA System. The attached proposal from Team Controls more specifically describes the proposed equipment. a) Adding two (2) pressure point nodes at Coppell Road and Moore Road, utilizing existing phone data lines and existing equipment where possible. b) Adding an auto-switch over from the new level controls to the existing level controls at the Sandy Lake Road and DeForest Lift Stations. c) Adding HOA status input of each pump to the SCADA system at the Sandy Lake Road and DeForest Road Lift Stations. The modification requires the addition of an extra mixed I/O module at each site. This modification will also allow the City to monitor the rain gauge data at the Sandy Lake Road Lift Station. d) Installing the proposed RTU and antenna scheduled for the new elevated storage tank at the Sandy Lake Road Pump Station in order to monitor the Dallas Water Utilities flow rate into Coppell. This is expected to be a temporary installation and will be moved to the new tank upon construction of the proposed DWU meter vault at the Village Parkway Pump Station. l:XCoppell\94156\Co_noS.doc Page 1 of 2 City of Coppell /~' T Villag~ Parkway Pump Station Add~,ons Change Order No. 5 C. EFFECT OF CHANGE ON CONTRACT AMOUNT This change will have the following affect on the final contract amount: Original Revised Change Revised Item Contract Contract Order Unit Contract No. Description Units Quantity Quantity Price Amount 27 Monitoring Pressure Points at Coppell Road L.S. 0 1 (~ St t2. $3,200 $3,200 and Moore Road 28 Sandy Lake Road &Deforest Road Lift L.S. 0 1 ~zt~o 63(~ 630 Stations level lxansmitter auto switch 29 Sandy Lake Road &DeForest Road Lift L.S. 0 1 2,840 2,840 Stations HOA Pump Status 30 Adding the DWU inflow to the SCADA system L.S. 0 1 2,290 2,290 by installing a RTU and Antenna at the Sandy Lake Road Pump Station~ Total Amount of Change [ I I $8,960. Original Contract Amount $933,000.00 Amount, Change Order No. 1 (5,000.00) Amount, Change Order No. 2 152,739.00 Amount, Change Order No. 3 2,468.00 Amount, Change Order No. 4 2,991.00 Amount, Change Order No. 5 $8,960.00 Revised Contract Amount $1,095,158.00 D. EFFECT OF CHANGE ON CONTRACT TIME The changes identified above has no effect on the revised contract time. Original Contract Time: 300 Calendar Days Calendar Days, Change Order No. 1 0 Calendar Days Calendar Days, Change Order No. 2 60 Calendar Days Calendar Days, Change Order No. 3 0 Calendar Days Calendar Days, Change Order No. 4 30 Calendar Days Calendar Days, Change Order No. 5 Calendar Days Revised Contract Time 390 Calendar Days l:\Coppell\94156XCo_noS.doc Page 2 of 2 City of Coppell ?"" ~ Villag~ ParRway Pump Station Add,.. Jns Change Order No. 5 E. AGREEMENT By the signatures below of duly authorized agents, the City of Coppell, Texas and North Texas Municipal Construction Company, Inc., do hereby agree to append this Change Order No. 5 to the original contract between themselves, dated January 9, 1996. City of Coppe!l, Texas North Texas Municipal Construction Company, Inc. Owner Contractor By: By: Date: Date: Attest: Attest: J:\Coppell\94156\Co_noS.doc Page 3 of 2