ST9902-CS130426
Halie Hernandez
From:Casey McBroom <CMcBroom@TNPINC.com>
Sent:Friday, April 26, 2013 10:46 AM
To:Keith Marvin
Subject:RE: Questions on W Sandy Lake Rd Phase 2A and 2B
Keith
I talked with Delvin, and he agreed that item I-187 could basically go away. Item I-186 covers both the sidewalks and the
median curbs, with I-187 covering the pad where the paver would have rested.
Once we changed to stamped concrete (paid under landscape plans), that pad is no longer necessary. Delvin said he
would be OK with leaving it in there as a little concrete fluff, or zeroing it out, either way.
All callouts on the bridge plans refer to the landscape plans for the median treatment with all mentions of pavers
removed otherwise.
Andrew is gathering up the paperwork, and checking his notes for design speed, and will get back with me shortly.
Casey McBroom, P.E.
Project Engineer
17304 Preston Road, Suite 1340
Dallas, Texas 75252
214.461.9867 Phone
972.900.5733 Mobile
214.461.9864 Fax
cmcbroom@tnpinc.com
From: Keith Marvin [mailto:KMarvin@coppelltx.gov]
Sent: Friday, April 26, 2013 9:50 AM
To: Casey McBroom
Cc: Chris Schmitt
Subject: FW: Questions on W Sandy Lake Rd Phase 2A and 2B
Keith Marvin, P.E.
City of Coppell
972-304-3681
1
From: Jennifer Cook
Sent: Thursday, April 25, 2013 5:01 PM
To: Keith Marvin
Subject: FW: Questions on W Sandy Lake Rd Phase 2A and 2B
Another question for W. Sandy Lake.
Thanks.
From: Mark Gaines [mailto:Mark@rebcon.com]
Sent: Thursday, April 25, 2013 4:33 PM
To: Jennifer Cook
Subject: Questions on W Sandy Lake Rd Phase 2A and 2B
Ms. Cook,
I can’t locate in the plans any reference on the bridge to paver base concrete even though there is a bid Item I-187
Bridge Class B Concrete for Paver base. There is also not an item for the decorative concrete in the median on the
bridge. I’m guessing this is related. Can you provide a detail for the concrete in the median and clarify the bid item if it
should be for the decorative median concrete?
Thanks,
Mark Gaines
Rebcon, Inc.
2