ST9902-CS130522 (2)
Halie Hernandez
From:Chris Schmitt <cschmitt@tnpinc.com>
Sent:Wednesday, May 22, 2013 10:18 AM
To:Keith Marvin
Cc:Casey McBroom; Chris Schmitt; Robert Jenkins; Andrew Luce
Subject:Re: Sandy Lake Road
Keith
Casey is out this week at RAS training. Ill get with Andrew and Robert and we will get this information to Don
Thanks
Chris
tnp
teague nall & perkins
Chris Schmitt, P.E.
Principal
17304 Preston Road, Suite 1340
Dallas, Texas 75252
214.461.9867 Main
903.421.1897 Mobile
214.461.9864 Fax
cschmitt@tnpinc.com
On May 22, 2013, at 10:10 AM, "Keith Marvin" <KMarvin@coppelltx.gov> wrote:
Casey,
Can you send don the information he is requesting below?
Thanks.
Keith Marvin
City of Coppell
Begin forwarded message:
From:
Don Roundtree <don@tandem-consulting.net>
Date:
May 22, 2013, 9:53:08 AM CDT
To:
Keith Marvin <KMarvin@coppelltx.gov>
Cc:
Lynn Brown <alb.engr@gmail.com>, Kyle Capps <kcapps@capco-inc.com>
Subject:Re: Sandy Lake Road
Reply-To:
Don Roundtree <don@tandem-consulting.net>
1
Thanks Keith, would you ask TNP to forward the traffic signal plans / profile for
the intersection of Sandy Lake & S. Coppell Road. We did not receive a
complete set of documents in earlier transmittals.
Don Roundtree, CSI, CCCA
Tandem Consulting, LLC
903-439-7217
www.tandem-consulting.net
From:
Keith Marvin <KMarvin@coppelltx.gov>
To:
Don Roundtree <don@tandem-consulting.net>
Sent:
Tuesday, May 21, 2013 11:23 AM
Subject:
RE: Sandy Lake Road
Don,
As long as you have the height to be clear of the new roadway elevation, and will not be
in conflict with the new traffic signal at this intersection, then we have no objection to an
aerial crossing at this location.
Keith Marvin, P.E.
City of Coppell
972-304-3681
From:
Don Roundtree [mailto:don@tandem-consulting.net]
Sent:
Monday, May 20, 2013 5:48 PM
To:
Keith Marvin
Cc:
Kyle Capps; Russell Saye
Subject:
Re: Sandy Lake Road
Keith, we believe we will be able to change our crossing of Sandy Lake Road @
S. Coppell Rd. to aerial. With the new concrete pole on the north side, we will be
high enough to follow cable tv with the aerial crossing. Do you see any problem
with this change? This will eliminate the need to do the bore.
Don Roundtree, CSI, CCCA
Tandem Consulting, LLC
903-439-7217
www.tandem-consulting.net
From:
Keith Marvin <KMarvin@coppelltx.gov>
To:
Don Roundtree <don@tandem-consulting.net>
Cc:
Chad Branum <cbranum@coppellisd.com>; Kyle Capps <kcapps@capco-inc.com>; Russell
Saye <rusty@rtelconst.com>
Sent:
Tuesday, April 30, 2013 11:41 AM
Subject:
Re: Sandy Lake Road
2
Thanks for the update.
Keith Marvin
City of Coppell
On Apr 30, 2013, at 11:24 AM, "Don Roundtree" <don@tandem-consulting.net>
wrote:
Chad, I anticipate that the work for your fiber relocation on Sandy
Lake will start late this week. First order of business is installing
new steel messenger strand. I will keep you posted. Thinking a
few weeks ahead, we need to start coordinating the cut over. We
intend to install new fiber so it will only take a few hours to cut
over, unless we have to pull the fiber back to behind the Verizon
building.
Thanks,
Don Roundtree, CSI, CCCA
Tandem Consulting, LLC
903-439-7217
www.tandem-consulting.net
3