Loading...
2014_0528CHECK ONE: IRRIGATION DOMESTIC �? 7.,- FIRELIN E BACI{FLOW PREVENTION ASSEMBLY TEST AND MAINTENANCE REPORT NAME OF PWS: PWS I.D. # CITY OF COPPELL LOCATION OF SERVICE: '� ) t r The baclflow prevention assembly detailed below has been tested and maintained as required by TNRCC regulations and is certified to be operating within acceptable parameters. TYPE OF ASSEMBLY C Reduced Pressure Principle C Pressure Vacuum Breaker C Double Check Valve ❑ Atmosphere Vacuum Breaker Manufacturer Size Model Number Serial Number Located At The above is certified to be true. Firm Name Firm Address Gauge # Date last accuracy tested ,� / Certified Taster Cent. Taster No. Dated =fir' White - Customer's Copy Yellow - City Copy Pink - Tester's Copy D REDUCED PRESSURE PRINCIPLE ASSEMBLY PRESSURE VACUUM BREAKER Double Check Valve Assembly Relief Valve Air Inlet Check Valve 1st Check: 2nd Check: Initial Test DC- Closed Tight ❑ Closed Tight C Leaked ❑ Opened at p si Opened at nsid nsid RP-_psid Leaked p Did not Open o Leaked ❑ Repairs ���2 C�r� �i %��41 �'/.,f✓ Materials Used Test After Repair DC- Closed Tight o Closed Tight o Opened at nsid Opened at vsid nsid RP sid The above is certified to be true. Firm Name Firm Address Gauge # Date last accuracy tested ,� / Certified Taster Cent. Taster No. Dated =fir' White - Customer's Copy Yellow - City Copy Pink - Tester's Copy D