Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
2012_1219
Water service shall not be provided or restored to the private water distribution facilities until the above conditions are determined to be in compliance. I certify that the following materials will be used in the installation of the private water distribution facilities located at Ty O ct, 4 Z and that the inspector will validate compliance during the inspection process: Service lines Lead ❑ Copper ❑ PVC ❑ Other ❑` Solder Lead ❑ Lead Free 13` Solvent Weld ❑ Other ❑ I recognize that this document shall become a permanent record of the aforementioned Public Water System and that I am legally responsible for the validity of the info ion I have provided. Signature of Licensed-Plumber Registration Number Type of Registration Date I recognize that this document shall become a permanent record of the aforementioned Public Water System and that I am legally responsible for the validity of the information provided. Signature of Inspector Type of Registration Registration Number Date White - Customers Copy Yellow - City's Copy Pink - Inspectors Copy CITY OF COPPELL WATER UTILITIES CUSTOMER SERVICE INSPECTION Residential 1 Commercial ❑ TN R, CC-ID #0570040 5/00A(e located I A/1>` , upon inspection of the private water distribution facilities at (7� fiekr 4t- , which is connected to the City of Coppell Water System, do hereby certify that, to the best of my knowledge: In Non- N/A Compliance Compliance (1) No direct connection between the public drinking water supply and a potential �' ❑ ❑ source of contamination exists. Potential sources of contamination are isolated from the public water system by an air gap or an appropriate backflow prevention assembly in accordance with Commission regulations. (2) No cross - connection between the public drinking water supply and a private water ©'j ❑ ❑ system exists. Where an actual air gap is not maintained between the public water supply and private water supply, an approved reduced pressure -zone backflow prevention assembly is properly installed and a service agreement exists for annual inspection and testing by a certified backflow prevention device tester. (3) No connection exists which would allow the return of water used for condensing ❑ ❑ cooling or industrial processes back to the public water supply. (4) No pipe or pipe fitting which contains more than 8.0% lead exists in private water r' ❑'' ❑ ❑ distribution facilities installed on or after July 1, 1988. (5) No solder or flux which contains more than 0.2% lead exists in private water l ❑ ❑ distribution facilities installed on or after July 1, 1988. Water service shall not be provided or restored to the private water distribution facilities until the above conditions are determined to be in compliance. I certify that the following materials will be used in the installation of the private water distribution facilities located at Ty O ct, 4 Z and that the inspector will validate compliance during the inspection process: Service lines Lead ❑ Copper ❑ PVC ❑ Other ❑` Solder Lead ❑ Lead Free 13` Solvent Weld ❑ Other ❑ I recognize that this document shall become a permanent record of the aforementioned Public Water System and that I am legally responsible for the validity of the info ion I have provided. Signature of Licensed-Plumber Registration Number Type of Registration Date I recognize that this document shall become a permanent record of the aforementioned Public Water System and that I am legally responsible for the validity of the information provided. Signature of Inspector Type of Registration Registration Number Date White - Customers Copy Yellow - City's Copy Pink - Inspectors Copy