Loading...
Country Estates-CS 920518 (2)RE: County Estates NDM Job No. 89-04-060 Dear Ken, Attached arc two sets of revised plans, your mark ups and a copy of your comment letter dated )v~y 12, 1992. The following relates to thc comment numbers from your letter: Item 6 The side slopes are not grass. They are concrete dp-rap. Item 11 We have beea p _roceed__Ang based on the belief that we had staff's acceptaace of our open channel design eoncept. If we are mistaken, please let us know ns soon as possible. Note that we have adjusted the headwall for Lime *C". Items 14, 16 and 20 Note that the elevations shown on our grading plan arc for Finished Pad, not Finished Floor. Item 15 We agree that a retaining wall will be required. It is our intent m leave thc construction of this wall up to the builder and his architect. Item 2~ We arc proceeding with our efforts to have this wall designed. We request that this not be a part of the subdlvbion's construction plans for public Improvements, but be treated as a separate issue. The reason for this request is that public Improvements for County Estates need to be done in an integral manner with Chautauqua and Bethel School/Harris Street which are already under construction. We hope to not hold up construction, awaiting a resolution of thc wall issue. Please let mc know if we need to discuss any of these issues. Sincerely, NATHAN D MAIER CONSULTIN~G ENGINEERS, INC.. Mike Daniel