Loading...
Freeport 2R Blk 3-140612 (3) DEVELOPMENT FEES PROJECT NAME: Freeport North, Lot 2R Blk 3 ENGINEER: ORIGINATION DATE:30-May-14 SENTASSESSMENTASSESSED FEEAMOUNT PAID DATE Water Impact Fee$11,844.00 Wastewater Impact Fee$4,797.00 Park Fee Roadway Impact-Zone$12,000.00$12,000.00hlh6/12/2014 Street Sign Street Light Construction Inspection$12,345.02$12,345.02hlh6/12/2014 EG or Bore Permit Overtime Inspection Water Tap Inspection$150.00 Wastewater Tap Inspection$50.00 Water Meter (Domestic)$882.00 Water Meter (Fire/Irrig)$882.00 Meter Deposit (Domestic)$30.00 Meter Deposit (Fire/Irrig)$60.00 Utility Final Inspection$50.00 Subtotal to Eng.$24,345.02$24,345.02$0.00 Total FeesFees PaidAmount Owed TOTALS $43,090.02$24,345.02$18,745.00 NOTES Prior To ConstructionDate ReceivedPrior To Final Acceptance Erosion Control ApprovedAs Built Plan Recd. E.P.A.-N.O.I. Recd.Paving Bond Recd. Const. Plan ApprovedUtilities Bond Recd. Erosion Control Maint.