Loading...
Fire_0605_2014 CHECK ONE: IRRIGATION DOMESTIC FIRELINE /t g v P4 S S BACKFLOW PREVENTION ASSEMBLY TEST' AND MAINTENANCE REPORT NAME OFPWS: �. G''( - /'r- pPr. /t PWS 1.D. # LOCATION OF SERVICE: 0-7/ J 3 r[: + ti .lc_ / /_3 .5 c, Lc. /'� S i rc 11v, ./t- The back flow prevention assembly detailed below has been tested and maintained as required by TCEQ regulations and is certified to be operating within acceptable parameters. TYPE OF ASSEMBLY a Reducxl Pressure Principle a Pressure Vacuum Breaker A;1 Double Check Valve a Atmosphere Vacuum Breaker Manufacturer (tic - r - T S Siz_e .3i Model Number (70 '71 -2 ') Located At l fov L' c h L a Pc She -c ( Iti Serial Number �a - O 5 REDUCED PRESSURE PRINCIPLE ASSEMBLY PRESSURE VACUUM BREAKER Double Check Valve Assembly 1st Check 1 2nd Check Relief Valve Air Inlet Check Valve Initial Test DC- Closed Closed Tight o Opened at Opened at psid 5/ hr)//4 Tight o Leaked Ja' psid _____psid r RP psid �'. Leaked rT2 Did not Open o Leaked a and R_epairs izr l -1=t" -) Materials 6'14 coe c N ce e' Used Test After DC- Closed Closed Tight Jar Opened at Opened at psid a ir Tight, .dP t _ 8 psid psid fj 3ji-1 RP et- � psid The above is certified to be true. q t S Firm Name /_Ic T.c) -'‘ c - C.-- Certified Testa 1---J fP-Se-1 r W e r. v1 Firm Address P e' ,.. 7S 7 Cert. Tester No. p 0,-9 9 7 D Date (../57 tni Co.�QGv, c LL.-. TY `Jj - fbi Gauge # CJ 30,900 i Date last accuracy tested White - Customer's Copy Yellow - City Copy Pink - Tester's Copy CIIECK ONE: IRRIGATION DOMESTIC FIRELINE • .. o BAC1CFLOW PREVENTION ASSEMBLY TEST AND MAINTENANCE REPORT NAME OFPWS: lc7,0pr /! PWS I.D. 0 LOCATION OF SERVICE: 1 ik- I -s c°1 i L �+ c / l ZcY S No fc, p f • ✓ The backtlow prevention assembly detailed below has been tested and maintained as required by TCEQ regulations and is certified to be operating within acceptable parameters. TYPE OF ASSEMBLY o Reduced Pressure Principle D Pressure Var+.+.m Breaker 1Z p` IJA Atmosphere Vacuum Breaker Manufacturer W c - s - r S Size Model Number 7 5 Located At /c ! - r.4 i4?�r Serial Number A) 1 3 REDUCED PRESSURE PRINCIPLE ASSEMBLY PRESSURE VACUUM BREAKER Double Check Valve Assembly 1st Check 1 2nd Check Relief Valve Air Inlet Check Valve Initial Test DC- Closed Closed Tight o Opened at Opened at psid 5 no/ t7/ Ti at o Leaked .07 psid _psid 1 c . L RP- 3.G usid Leaked 127 Did not Open t7 Leaked C7 and Materials pPc Cam. a C /cc a. Gh, 1 .e- �cckl =�cc/ Materials Caecd Used Test After DC- Closed Closed Tight /29 Opened at Opened at _psid Repair Tight _-3 -z� � c _psid nsid RP psid The above is certified to be true. y r fj Firm NameAL G' n Certified Tester N I.Jc -* »z W c.. Firm Address ` V:;Q - :c 7 c 7 - 7 Celt Testa 6U 6 No. (900 91 � 5 Date � /4 vic )rcv.c ch� T� 7� / b5 Gauge # 03c 6 oa i `�l Date Last accuracy tested White - Customer's Copy Yellow - City Copy Pink - Tester's Copy