ST9902-CS130723 (4)
Halie Hernandez
From:Delvin Black <dblack@tnpinc.com>
Sent:Tuesday, July 23, 2013 9:25 AM
To:Keith Marvin; Chris Schmitt
Cc:Casey McBroom; Rick Odell; Caudill Robert; srco@prodigy.net; Twidmer@ibctx.com
Subject:RE: W. Sandy Lake Rd
I called Steve Rizo to get a better understanding of the problem that he was having. Apparently there was some
confusion regarding the center line of the roadway in the area of the bridge being shifted 3 feet to the northeast of the
control line. After explaining this, he indicated that this solved the problem.
Please contact us if there are any further questions.
Delvin Black, Ph.D., P.E.
Senior Engineer - Structural
1100 Macon Street
Fort Worth, Texas 76102
817.336.5773 Main
817.665.7175 Direct
817.480.8968 Mobile
817.336.2813 Fax
dblack@tnpinc.com
From: Keith Marvin [mailto:KMarvin@coppelltx.gov]
Sent: Tuesday, July 23, 2013 7:04 AM
To: Chris Schmitt
Cc: Casey McBroom; Rick Odell; Delvin Black; Caudill Robert
Subject: Re: W. Sandy Lake Rd
Thanks Chris. I'm in meetings this morning, so if you need more information, feel free to call Tiseo, or their
subs listed in the email directly.
Let Rick and I know what you figure out.
Keith Marvin
City of Coppell
On Jul 23, 2013, at 6:57 AM, "Chris Schmitt" <cschmitt@tnpinc.com> wrote:
Keith,
We’ll get on it first thing this morning and follow up as soon as we have some additional info.
Chris
1
<image001.jpg>
Chris Schmitt, P.E.
Principal
17304 Preston Road, Suite 1340
Dallas, Texas 75252
214.461.9867 Main
903.421.1897 Mobile
214.461.9864 Fax
cschmitt@tnpinc.com
From: Keith Marvin [mailto:KMarvin@coppelltx.gov]
Sent: Tuesday, July 23, 2013 6:41 AM
To: Casey McBroom
Cc: Chris Schmitt; Rick Odell
Subject: Fwd: W. Sandy Lake Rd
Can you guys review this email chain and let me know what you think.
Keith Marvin
City of Coppell
Begin forwarded message:
From:
Robert Caudill <rcaudill@TiseoPaving.com>
Date:
July 23, 2013, 6:02:50 AM CDT
To:
Keith Marvin <KMarvin@coppelltx.gov>
Cc:
Robert Caudill <rcaudill@TiseoPaving.com>
Subject:FW: W. Sandy Lake Rd
Keith;
Can you or someone else resolve the problem at the bridge.
Robert Caudill
Vice President
Tiseo Paving Company
(972) 289-0723
From: Trent Widmer [mailto:twidmer@ibctx.com]
Sent: Monday, July 22, 2013 9:55 PM
To: Robert Caudill
Cc: ckumnick@iowabridge.com; chanson@iowabridge.com
Subject: FW: W. Sandy Lake Rd
Robert,
Our surveyor has found some inconsistencies with the bridge and needs some additional
information. Please advise.
Thanks,
2
Trent Widmer
Superintendent
Iowa Bridge & Culvert, LC
9100 Hwy 380
Cross Roads, TX 76227
214.347.1219 M
940.440.0099 O
940.440.0079 F
143*100509*5 Nextel
twidmer@ibctx.com
The information in this message may be priviledged, confidential, and protected from
disclosure. If you are not the intended recipient, employee, or agent responsible for
delivery to intended recipient, any dissemination is strictly prohibited. If you have
recieved this communication in error, please notify sender immediatley. Opinions,
conclusions and other information in this message, unless otherwise stated, that do not
relate to Iowa Bridge & Culvert, LC (IBC) official business, are those of the sender and
are neither given or endorsed by IBC.
From: Steven Rizo [mailto:srco@prodigy.net]
Sent: Monday, July 22, 2013 4:49 PM
To: Twidmer@ibctx.com
Subject: W. Sandy Lake Rd
Trent,
I need some clarification on bridge info. According to bridge abutment, bent, and
typical sections, I'm seeing an 81' bridge: 37' Left and 44' Right. It looks right
with bridge layout and paving centerline. I'm missing the plan coordinates on
drilled shaft locations. Stations look correct as does the skew with the published
data. However, my data seems to have me shifted 3' short to the left and 3' long
to the right. I am also missing total distance between outside drilled shafts by 0.5'
when compared to said coordinates. Please forward for an RFI.
Thanks, Steve Rizo
Steven Rizo Company
817-307-3060
3