ST9902-CS130809
Halie Hernandez
From:Casey McBroom <CMcBroom@TNPINC.com>
Sent:Friday, August 09, 2013 4:01 PM
To:Keith Marvin
Subject:RE: Sandy Lake Revised Bridge Pier Plans
Sounds good; If you want me out there at any time just let me know. Preferably when it’s back in the mid to high 70’s.
Casey McBroom, P.E.
Project Engineer
17304 Preston Road, Suite 1340
Dallas, Texas 75252
214.461.9867 Phone
972.900.5733 Mobile
214.461.9864 Fax
cmcbroom@tnpinc.com
From: Keith Marvin [mailto:KMarvin@coppelltx.gov]
Sent: Friday, August 09, 2013 3:41 PM
To: Casey McBroom
Subject: RE: Sandy Lake Revised Bridge Pier Plans
Thank you. We sent these on to Tiseo this afternoon. We’re going to work on killing out the 8” water next week, and
th
they will drill beginning on Monday the 19.
Keith Marvin, P.E.
City of Coppell
972-304-3681
From: Casey McBroom [mailto:CMcBroom@TNPINC.com]
Sent: Friday, August 09, 2013 11:36 AM
To: Keith Marvin
Cc: Chris Schmitt
Subject: Sandy Lake Revised Bridge Pier Plans
Keith
Here are the remaining revised sheets from Delvin. I believe this is everything.
FYI, we are getting real close to having a submittal set ready for HWY 121 as well. You should likely have something
early to mid-week.
Thanks.
1
Casey McBroom, P.E.
Project Engineer
17304 Preston Road, Suite 1340
Dallas, Texas 75252
214.461.9867 Phone
972.900.5733 Mobile
214.461.9864 Fax
cmcbroom@tnpinc.com
2