ST9902-CS130809 Halie Hernandez From:Casey McBroom <CMcBroom@TNPINC.com> Sent:Friday, August 09, 2013 4:01 PM To:Keith Marvin Subject:RE: Sandy Lake Revised Bridge Pier Plans Sounds good; If you want me out there at any time just let me know. Preferably when it’s back in the mid to high 70’s. Casey McBroom, P.E. Project Engineer 17304 Preston Road, Suite 1340 Dallas, Texas 75252 214.461.9867 Phone 972.900.5733 Mobile 214.461.9864 Fax cmcbroom@tnpinc.com From: Keith Marvin [mailto:KMarvin@coppelltx.gov] Sent: Friday, August 09, 2013 3:41 PM To: Casey McBroom Subject: RE: Sandy Lake Revised Bridge Pier Plans Thank you. We sent these on to Tiseo this afternoon. We’re going to work on killing out the 8” water next week, and th they will drill beginning on Monday the 19. Keith Marvin, P.E. City of Coppell 972-304-3681 From: Casey McBroom [mailto:CMcBroom@TNPINC.com] Sent: Friday, August 09, 2013 11:36 AM To: Keith Marvin Cc: Chris Schmitt Subject: Sandy Lake Revised Bridge Pier Plans Keith Here are the remaining revised sheets from Delvin. I believe this is everything. FYI, we are getting real close to having a submittal set ready for HWY 121 as well. You should likely have something early to mid-week. Thanks. 1 Casey McBroom, P.E. Project Engineer 17304 Preston Road, Suite 1340 Dallas, Texas 75252 214.461.9867 Phone 972.900.5733 Mobile 214.461.9864 Fax cmcbroom@tnpinc.com 2