Hard 8 BBQ-CS140710
Halie Hernandez
From:Michael Garza
Sent:Thursday, July 10, 2014 3:52 PM
To:Edward Kellie
Cc:Halie Hernandez
Subject:RE: Hard Eight BBQ-Crescent Addition lot 1r Block A
Attachments:Floodplain Development Permit.pdf; Construction Development Fillable.pdf
Ed,
The only comments I have are:
1.The top of curb at the island needs to match existing ground, you don’t have any proposed elevations on
these. The contractor will need to excavate at least 6” to place this parking lot on existing grade.
2.There cannot be any areas elevated above existing ground in the floodplain area.
3.Remove the standard details sheet, it’s an extra sheet that we do not need in the set, the contractor will have a
separate copy.
4.Provide a detail how the pipe will penetrate the gabion wall. Reference existing storm drains.
Attached is the flooplain permit and the construction development permit. Have the contractor fill out the
construction permit and pay the inspection fees. Once the fees are paid we can have a pre-construction
meeting.
If you have any questions, please contact me at your convenience.
Thanks,
Michael Garza, P.E.
Assistant Director of Engineering
Engineering Department
City of Coppell, TX
www.coppelltx.gov
972-304-7019 (office)
Please take our customer service survey
From: Edward Kellie [mailto:EKellie@kellie-engineering.com]
Sent: Thursday, July 10, 2014 2:55 PM
To: Michael Garza
Subject: Hard Eight BBQ
Mike:
Do you have engineering comments for me yet?
1
Can you please email me the floodplain development permit, I didn’t see it online.
Thanks,
Edward Kellie, P.E.
Kellie Engineering, Inc.
Tel. 817-455-1396
Fax. 817-704-4458
ekellie@kellie-engineering.com
2