Loading...
ST9902-CS130814 (3) Halie Hernandez From:twidmer@ibctx.com Sent:Wednesday, August 14, 2013 10:16 AM To:Keith Marvin Subject:Re: Sandy Lake Revised Bridge Pier Plans I received a stamped copy from Rick. Trent Widmer Iowa Bridge Sent from my Motorola Smartphone on the Now Network from Sprint! -----Original message----- From: Keith Marvin <KMarvin@coppelltx.gov> To: "twidmer@ibctx.com" <twidmer@ibctx.com> Cc: Rick Odell <ROdell@coppelltx.gov> Sent: Wed, Aug 14, 2013 10:13:47 CDT Subject: FW: Sandy Lake Revised Bridge Pier Plans Here you go. Just remember to have the stamped plans on the job site. I can stamp more if needed. Keith Marvin, P.E. City of Coppell 972-304-3681 From: Casey McBroom [mailto:CMcBroom@TNPINC.com] Sent: Friday, August 09, 2013 11:36 AM To: Keith Marvin Cc: Chris Schmitt Subject: Sandy Lake Revised Bridge Pier Plans Keith Here are the remaining revised sheets from Delvin. I believe this is everything. FYI, we are getting real close to having a submittal set ready for HWY 121 as well. You should likely have something early to mid-week. Thanks. Casey McBroom, P.E. Project Engineer 17304 Preston Road, Suite 1340 Dallas, Texas 75252 1 214.461.9867 Phone 972.900.5733 Mobile 214.461.9864 Fax cmcbroom@tnpinc.com 2