ST9902-CS130814 (3)
Halie Hernandez
From:twidmer@ibctx.com
Sent:Wednesday, August 14, 2013 10:16 AM
To:Keith Marvin
Subject:Re: Sandy Lake Revised Bridge Pier Plans
I received a stamped copy from Rick.
Trent Widmer
Iowa Bridge
Sent from my Motorola Smartphone on the Now Network from Sprint!
-----Original message-----
From: Keith Marvin <KMarvin@coppelltx.gov>
To: "twidmer@ibctx.com" <twidmer@ibctx.com>
Cc: Rick Odell <ROdell@coppelltx.gov>
Sent: Wed, Aug 14, 2013 10:13:47 CDT
Subject: FW: Sandy Lake Revised Bridge Pier Plans
Here you go. Just remember to have the stamped plans on the job site. I can stamp more if needed.
Keith Marvin, P.E.
City of Coppell
972-304-3681
From: Casey McBroom [mailto:CMcBroom@TNPINC.com]
Sent: Friday, August 09, 2013 11:36 AM
To: Keith Marvin
Cc: Chris Schmitt
Subject: Sandy Lake Revised Bridge Pier Plans
Keith
Here are the remaining revised sheets from Delvin. I believe this is everything.
FYI, we are getting real close to having a submittal set ready for HWY 121 as well. You should likely have something
early to mid-week.
Thanks.
Casey McBroom, P.E.
Project Engineer
17304 Preston Road, Suite 1340
Dallas, Texas 75252
1
214.461.9867 Phone
972.900.5733 Mobile
214.461.9864 Fax
cmcbroom@tnpinc.com
2