Freeport-2R Blk 3-CS140723 Halie Hernandez From:Michael Garza Sent:Wednesday, July 23, 2014 2:02 PM To:Halie Hernandez Subject:Re: "Note" from Larry can you place this email in the file. thanks, Sent from my iPad On Jul 23, 2014, at 11:08 AM, "Halie Hernandez" <HHernandez@coppelltx.gov> wrote: Larry had to make a field change on Freeport related to depth and diameter of a pier the contractor had encountered a dense sandstone, had to leave it over night the shaft collected water disintegrated the shaft where the water came in contact. “I had Richard Gee come to the project early this morning so we could make an evaluation of what to do, there were two options the lesser option in my opinion would not give us the load bearing we needed so I took the second option and increased the shaft diameter from 30 inches to 36 inches which will be more than adequate to provide the load bearing requirements for the bridge pier shaft”. Thank you, Halie Hernandez Administrative Technician 972-304-3682 hhernandez@coppelltx.gov 1