Loading...
MA 10-07-CS140726 Halie Hernandez From:Rick Odell Sent:Saturday, July 26, 2014 4:22 PM To:Halie Hernandez Subject:Fwd: Belt Line & MacArthur Cyl Test Results Sent from my iPhone Begin forwarded message: From: Perry Kakara <PKakara@aggengr.com> Date: July 26, 2014, 9:11:28 AM CDT To: Dusty DeFury <dusty@bowmanconstruction.com> Cc: Adrian Bowman <adrian@bowmanconstruction.com>, George Marshall <gmarshall@coppelltx.gov>, Halie Hernadez <hhernadez@coppelltx.gov>, "Rick O'Dell" <rodell@coppelltx.gov> Subject: Re: Belt Line & MacArthur Cyl Test Results Reply-To: Perry Kakara <PKakara@aggengr.com> Todays 24 hour test is 3760 psi Sent via BlackBerry from T-Mobile From: Dusty DeFury <dusty@bowmanconstruction.com> Date: Fri, 25 Jul 2014 17:37:20 -0500 To: Perry Kakara<PKakara@aggengr.com> Cc: Adrian Bowman<adrian@bowmanconstruction.com>; George Marshall<gmarshall@coppelltx.gov>; Halie Hernadez<hhernadez@coppelltx.gov>; Rick O'Dell<rodell@coppelltx.gov> Subject: Re: Belt Line & MacArthur Cyl Test Results Thanks Perry. I have all traffic control scheduled to be picked up Tommorow at 4pm. Of course this all rides on the breaks of what we poured today being at 3200psi. Please get the results to me as soon as possible in the morning so I can either remove traffic control or reschedule them for Sunday. Thanks, Dusty JBCC Sent from my iPhone On Jul 25, 2014, at 10:03 AM, Perry Kakara <PKakara@aggengr.com> wrote: Perry Kakara, S.E.T. CME Department Manager Alliance Geotechnical Group email: pkakara@aggengr.com Office: 972-444-8889 1 Cell: 972-603-5432 <Belt Line & MacArthur 24 hour test results placed 7-24-14.pdf> 2