Loading...
2014_0703 CIIECK ONE: IRRIGATION h DOMESTIC FIRELINE BACI FLOW PREVEN'T'ION ASSEMBLY TEST AND MAINTENANCE REPORT NAME of Pws : c: , •T I 4" F' Cc f � F' ,° / y �� b PWS I.D. # c err:. & LOCATION OF SERVICE: The backflow prevention assembly detailed below has been tested and maintained as required by TCEQ regulations and is certified to be operating within acceptable parameters. TYPE OF ASSEMBLY ❑ Reduced Pressure Principle ❑ Pressure Vacuum Breaker Double Check Valve ❑ Atmosphere Va.-..um Breaker Manufacturer /A.,/ • ? Size Z s+ Model Number caf9 7,4-4 Located At c_514J Serial Number O q 2- REDUCED PRESSURE. PRINCIPLE ASSEMBLY PRESSURE VACUUM BREAP:ER 1 Double Cheek Valve Assembly 1st Cheek tad Cheek Relief Valve Air Inlet Check Valve Initial Test DC- Closed Closed Tight ,/ef Opened at Opened at nsid Tight— e) 12C.: Leaked ❑ nsid nsid RP- L trsid /. e Leaked o Did not Open ❑ Leaked ❑ Repairs and Materials Used Test After DC- Closed Closod Tight a Opened at Opened at nsid Repair Tight ❑ nsid aid RP • sid The above is // certified to be true. ! 1 � Firm Name �` o_`E l !�'r'1 Y l Y -e �� e`?5 Certified Tester LI �S G r l t- fC✓.C' TO to Firm Address J0Q �X 74 7 Cert. Tester No. �f'/ 1 Date . 7/: / % c, 6VezzCe h&c It Lc_ 151 LOS Gauge # t"Vl� /lrJ‘") 7s" Date last accuracy tested f/6`,(F White - Customer's Copy Yellow - City Copy Pink - Tester's Copy