Loading...
Creekview North-CS 890418TO: CITY OF COPPELL 255 PARKWAY BLVD. P. 0. BOX 478 COPPELL, TEXAS 75019 (214) 462-0022 Nathan D. Maier Consulting Engineers, Inc. Three North Park ~300 8800 N. Central Expressway Dallas, TX 75231 Ap~l 18/89 ' [ ~k View N~h Add~ti~ A~E~ION: Pet~ Sta~ RE: WE ARE SENDING YOU [x ] Attached [ ] Mark Up Plans [ ] Copy of Minutes ] Under Separate Cover via [ ] Plans [ ] Copy of Letter the following items: [ ] Prints [ ] Specifications [ ] Change order [ ] COPIES DATE NO. DESCRIPTION REMARKS: THESE ARE TRANSMITTED as checked below: [ ] For Your Use [ ] As Requested [ ] For Review & Comment [ ] Returned for Corrections [ ] Resubmit__Copies for Approval [ ] Return Corrected Prints 2 Mylars- 10 Executed Final Plats [x ] Approved as Noted [ ] Approved as Submitted [ ] Note & Reply To: [ ] Note & Forward To: [ ] Submit Copies for Distribution [ ] Return Markup Plans with Corrections Please find attached procedures for filing an executed final Plat. If you have any questions, please contact the Engineering Department at (214) 462-0022. TO: CITY OF COPPELL 255 PARKWAY BLVD. P. O. BOX 478 COPPELL, TEXAS 75019 (214) 462-0022 DATE: I PROJECT: ATTENTION: WE ARE SENDING YOU ~)~. Attached [ ] Under Separate Cover via [ ] Mark Up Plans [ ] Plans [ ] Copy of Minutes [ ] Copy of Letter [ ] Change order [ ] the following items: [ ] Prints [ ] Specifications CO~iES DATE NO. DESCRIPTION THESE ARE TRANSMITTED as checked below: ~)~] For Your Use ~ ~o~ ~~/[ ] Approved as Noted ~><] As Requested [ ] Approved as Submitted [ ] For Review & Comment [ ] Note & Reply mo: [ ] Returned for Corrections [ ] Note & Forward To: REMARKS: [ ] Resubmit [ ] Return Copies for Approval Corrected Prints [ ] Submit Copies for Distribution [ ] Return Harkup Plans vith Corrections :OPY TO: ~g O~ GINN, INC. Consulting Engineer~ 17103 Preston Road Suite 100. LB-118 DALLAS, TEXAS 75248 (214) 248-4900 TO WE ARE SENDING YOU yAtb [] Shop drawings [] Under serrate ~ver vma [] Prints RE: [] Plans [] Samples the following items: [] Specifications Copy of letter [] Change order [] cOpIES DATE NO. DESCRIPTION THESE ARE TRANSMITTED as checked below: [] For approval //~ For your use As 'requested [] For review and comment [] FOR BIDS DUE [] Approved as submitted [] Approved as noted [] Returned for corrections 19 [] Resubmit [] Submit [] Return copies for approval copies for distribution corrected prints __ [] PRINTS RETURNED AFTER LOAN TO US REMARKS COPY TO PflOOUCT240-3 ~k~..,GgeM~ k 0147] / SIGNED: . If enc/osures are not es noted, kindly notify us at once. 6330 Belt Line Road Suite C February 27, 1989 Garland, Texas 75043 Mr. Kevin E...Peiffer, P.E, GINN, INC. 17103 Preston Rd. Suite 100 Dallas, TExas 75248 RE: CREEKVIEW NORTH ADDITI Coppell, Texas Dear Mr. Peiffer, (214) 226-2967 ~3~-~ ~ ~1 3280 This is your notification that the fill placed on the site and within the proposed 'street R.O.W. will be placed in a manner to prevent the trench depth from exceeding five (5') feet. This will be accomplished by coordination between the excavation contractor and the utility contractor. If at any time trench depth for installation for any water, sanitary sewer and storm drainage facilities exceed five (5') feet in depth a trench safety plan is to be furnished to the City of Coppell prior to construction of those facilities. If you have any questions, please contact ou~~c~ at your convenience- / . DON A. TIPTON, INC. cc: Hs. ~udy Troth Parsons Boney Construction Company-Excavation ~nd Paving Contractor Cra~ford ~tility Company-~tilLtY Contractor GINN, INC. CONSULTING ENGINEERS February 2~/.~ 9 Mr. Russ/1 Doyle, city of/Coppell P.O. B/x 478 Coppetl, TX 75019 Re: Creekview North Addition Coppell, TX Dear Mr. Doyle: We have reviewed the construction plans for the above referenced project and offer the following comments. Per paragraph 3 of our attached review letter of 11/23/88, please note that the applicant has not included trench safety plans in their construction plan sets, therefore, all utilities will need to be installed while the trenches are less than 5 feet deep. This is not to imply, however, as waiving any city cover requirements. The trench depth note on the utility plans should not provide the contractor any options. You may want to have the wordage revised, or just have Public Works monitor compliance with the State laws, HB 662 and 665 since the project is small in size. 3. The floodplain development permit is ready for the  ~ Floodplain Administrator's signature on the final plat. Please call if you have any questions. S incer~.~ ~/ Kevin Peiffer/~. E. KP/dsp cc: File 89305 17103 ~reston Road · Suite 100 · LB 118 · D,"._,' .........