Loading...
2014_0711 CHECK ONE: IRRIGATION x DOMESTIC FIRELINE BACICFLOW PREVENTION ASSEMBLY TEST AND MAINTENANCE REPORT NAME OF PWS: CITY OF COPPELL PWS I.D. # p� I �,_- J 9 LOCATION OF SERVICE: l7 yO L c /971 L� L,R■ The bacldlow prevention assembly detailed below has been tested and mail-II as required by TNRCC regulations and is terrified to be operating within acceptable parameters. TYPE OF ASSEMBLY C Reduced Pressure Principle C Pressure Vacuum Breaker Double Check Valve c7 Atmosphere Vacuum Breaker Manufacturer - - e L Size Model Nummber Z � v Located At Serial Number PI � � " J , 6 \ REDUCED PRESSURE PRINCIPLE ASSEMBLY PRESSURE VACUUM BREAKER Double Check Valve Assembly 1st Check 2nd Check Relief Valve Air Inlet Cheek Valve Initial Test DC- Closed Closed Tight ° Opened at Opened at vsid Tight Ft) )3B° � Leaked o vsid osid RP- osid /f Leaked a °r Did not Open O Leaked Reps and Materials Used Test After DC- Closed Closed Tight a Opened at Opened at osid Repair Tight osid osid RP psid - -- - - -- The above is certified to be true. Film Name 01 Accuracy Bircle Certified Ctified Tester 7( .5 /25rio.f1-1/ / f I Firm Address Frisco, TX 75033 Cert Tester No. 3 Date / -7 - 1 - 3 Gauge * o m9y Date last accuracy tested -6 -pi White - Customer's Copy Yellow - City Copy Pink - Tester's Copy