Loading...
Coppell_E-Care-LR140731 ECS Texas, LLP 3033 Kellway Drive, Suite 110 CONCRETE, GROUT, AND MORTAR TESTS Carrollton, TX 75006 LETTER OF TRANSMITTAL (972) 392-3222 [Phone] (214)483-9684 [Fax] Texas Registered Engineering Firm # F-8461 07/31/2014 DATE: TO:Interra Partners, LLC Lincoln Centre, Building 3 Coppell E-Care RE: 5430 LBJ Freeway, Suite 960 PERMIT #: Dallas, TX 75240 ATTN:Mr. WilliamR. Hurd JOB NO.:005924A1 LOCATION: 330 S Denton Tap Road, Coppell, TX Dallas County Weare enclosing: XAttachedXFor Your Use XMaterials Engineering Division Concrete Reports:As Requested X 21 CityOf Coppell - Rick O'dell CC: Hill & Wilkinson Construction Group, Ltd - Matthew Vea Hill & Wilkinson Inc. - Jason Avant Jennifer Shields, P.G.Victor Faltas JUL 31 2014 By: Project GeologistProject Engineer This report (and any included attachments) shall not be reproduced, except in full, without the prior written approval of ECS. Grout Prisms Strength Report ECS Texas, LLP 3033 Kellway Drive, Suite 110 Carrollton, TX 75006 Project :Set Designation:B 5924-A1 (972) 392-3222 [Phone] Cast Date: (214)483-9684 [Fax] 07/02/2014 Design Strength: 3000 psi Project:Coppell E-Care Report No.: 21 Location:330 S Denton Tap Road, Coppell, TX Interra Partners, LLC - WilliamR. Hurd Owner:Client: Interra Partners, LLC - WilliamR. Hurd Arch.: Gen. Contr.:Hill & Wilkinson Inc. - Jason Struc. Eng.:Conc. Contr.: Placement Location:Grout for the second course of the North and East Concrete Supplier:On-SiteTruck No:0Ticket No:0 Mix Designation:3000Mix Strength:3000 psiBatch Time: 07:20AM Added Water: Time Added:Unit Wt.: NadyShehata FIELD TEST DATA:Tested by:Time Sampled:08:20AMSlump: Air Content: Temperature - Air:82º FConcrete: TypeArea SampleTestTestBreakingBrkReview Length Compr. CureIn.In.² NoDateAgeTypby Load,lbsStr.,psi 07/30/2014 10283628Lab3.4411.83387523270VF 07/30/2014 10283728Lab3.4411.83343042900VF 07/30/2014 10283828Lab3.4411.83456643860VF Sampling, prism molding, and laboratory curing in accordance with (iaw) ASTM C1019. Compressive strength test iaw ASTM C39, temperature iaw ASTM C1064, slump iaw ASTM C143, and capping iaw ASTM C617. FIELD CURING CONDITIONS: XInsulatedCooledIce Curing Box No Curing BoxHeatedCapsOther Remarks: Final Review By: VF Print Date:07/31/2014 BR01