Loading...
WA9301-CS 941209CJGIIGS !..-, c i' UTIlITIeS Oity Hall · Dallas, Texas 7S~'77 · 914/G70-314G O E C 19 1994 PUBLIC WORKS December 9, 1994 Howard Pafford Utilities Superintendent City of Coppell P.O. Box 478 Coppell, Texas 75019 Dear Howard: Dallas Water Utilities has re-estimated the construction cost of the proposed metering station based on the revised location at the southwest coruer of the lot. The revised cost is $550,000. This cost estimate includes additional fill and driveway work. Please feel free to call me if you have any questions. Sincerely, W. David Ryburu Manager ~Vholesale Services pb c: Larry Riven, Dallas Water Utilities A city utility providing Dallas with water purification and distribution, waste water collection and treatment The City With A Beautiful Future P.O. Box 478 Coppell, Texas 750 ~ 9 214-462-0022 August 1, 1994 Mr. David Ryburn, Manager Dallas Water Utilities Wholesale Services Division 1500 Marilla - 4AN Dallas, TX 75201 RE: Response to Letter Dated July 15, 1994, Regarding the New Rate of Flow Controller Dear Mr. Ryburn: I am in receipt of your letter and upon review, I offer the following answers: To better utilize the space available, please design the new R.O.F.C. to be installed in the far southwestern corner of the site. D.W.U. should proceed with the work required to process the flood plain permit. The driveway and return between existing Sandy Lake Road and the right-of-way line can be asphalt pavement; all other surfaces must be 6" concrete. 4. The new facility will be built over the existing drainage swale. It will be necessary to design a drainage pipe through the filled area. you need additional information before proceeding with the .~esig~ please contact me at (214) 462-8495. incerely, r~f"~bilc Works /dm cc: Ken Griffin, City Engineer Howard L. Pafford, Utilities Superintendent