Copperstone-CS 890508e~sed~ 5/2~/87
CITY OF COPPELL
ACTION REQUEST FOILM
FILE COPY
TO:
Lawrence Jackson
City Attorney
1800 Lincoln Plaza
500 North Ackard
Dallas, Texas 75201
DUE DATE: ~ C~.p
DATE SCHEDULED FOR CITY COUNCIL:
APPROVAL OF DEPARTMENT HEAD: ,~S~ /'~:~L-~"'f ~L-ooO tl~z'/W4~/'~/~'~--
cc: Alan D. Ratliff, City Manager
INSTRUCTIONS:
IF THE REQUEST IS FOR AN AMENDMENT, REPEAL OR CONCEP~NS A PROVISION
OF THE CODE OF ORDINANCES, CITE APPLICABLE SECTIONS OF THE ORDINANCE AND
OR ATTACH A COPY OF CODE PAGE(S), AND NOTE THE CHANGES TO BE MADE.
IF THE REQUEST IS FOR REVIEW, INTERPRETATION OF, OR AMENDMENT TO A
LEASE OR OTHER DOCUMENT(S), ATTACH HERETO.
STATE ACTION REQUESTED AND INCLUDE OR ATTACH ALL NECESSARY
INFORMATION.
~R LEGAL DEP~ USE O~Y
DATE ~Cgl~ INACTION ~ DATE
ACT/RQST/FORM
PZA~
'idP Jerry Parch~ Consulting Engineers
May 1, 1989
Mr. Russell Doyle, P.E.
City Engineer
City of Coppell
P O Box 478
Coppell, Texas 75019
214/471-2251
RE:
JP No. 88009; Flood Plain Reclamation Study;
Denton Creek and Cottonwood Branch;
Parks of Coppe11; Coppell, Texas
Dear Russell:
Thank you for your letter of March 28, 1989, which we received on
April 20, 1989, regarding the status of the FEMA review of the
Magnolia Park project. It is our understanding that a request
for a Final Letter of Map Revision is being processed by FEMA for
Magnolia Park. Our current request in the Parks of Coppell,
which was submitted to the City on February 21, 1989, is for a
Conditional Letter of Map Revision.
I understand that the issue of maintenance on the Magnolia Park
project is not resolved. However, please proceed with the City's
technical review of proposed reclamation in the Parks of Coppell
as presented in our report. Since our Denton Creek analysis
includes constructed projects in the area, we understand that
your technical review and approval are qualified pending outcome
of the Magnolia Park Project Map Revision request.
On behalf of ABQ Development Corporation, please expedite the
City review. Our client has authorized us to proceed with
preparation of construction plans for the extension of Parkway
Boulevard west of the High School Access Road, including the
Cottonwood Branch bridge. Roadway grades and the bridge opening
design, however, are largely based on flood plain hydraulics and
therefore our design efforts are restrained until conditional
FEMA and City of Coppell appro~,al of the flood study are
received.
Please advise me if their is any further information required by
the City of Coppell needed to expedite your review. Thank you.
Sincerely,
JP: ch
cc: Mr. Jay Chester, P.E./ABQ Development Corporation
Mr. Ron Morrison, P.E./Kimley Horn and Associates, Inc.
320 L~/estway Place, Suite 501 · Arlington, Texas 76018 · Metro (817) 467-2418 · (817J 465-0259
\/
t
CITY~ --'¢ised:..
ACTION REQUEST FORM
5/21/87
TO:
Lawrence Jackson
City Attorney
1800 Lincoln Plaza
500 North Ackard
Dallas, Texas 75201
DUE DATE:. ~ ~ ~
DATE SCHEDULED FOR CITY COUNCIL:
APPROVAL OF DEPARTMENT HEAD:
cc: Alan D. Ratliff, City Manager
INSTRUCTIONS:
IF THE REQUEST IS FOR AN AMENDMENT, REPEAL OR CONCERNS A PROVISION
OF THE CODE OF ORDINANCES, CITE APPLICABLE SECTIONS OF THE ORDINANCE AND
OR ATTACH A COPY OF CODE PAGE(S), AND NOTE THE CHANGES TO BE MADE.
IF THE REQUEST IS FOR REVIEW, INTERPRETATION OF, OR AMENDMENT TO A
LEASE OR OTHER DOCb~ENT(S), ATTACH HERETO.
STATE ACTION REQUESTED AND INCLUDE OR ATTACH ALL NECESSARY
INFORMATION.