Loading...
Copperstone FS-CS 890501 4P . Jerry Parch Consulting Engineers ~ay l, 1989 Mr. Russell Doyle, P.E. City Engineer City of Coppell P O Box 478 Coppell, Texas 75019 214/471-2251 JP No. 88009; Flood Plain Reclamation Study; Denton Creek and Cottonwood Branch; Parks of Coppell; Coppell, Texas Dear Russell: Thank you for your letter of March 28, 1989, which we received on April 20, 1989, regarding the status of the FEMA review of the Magnolia Park project. It is our understanding that a request for a Final Letter of Map Revision is being processed by FEMA for Magnolia Park. Our current request in the Parks of Coppell, which was submitted to the City on February 21, 1989, is for a Conditional Letter of Map Revision. I understand that the issue of maintenance on the Magnolia Park project is not resolved. However, please proceed with the City's technical review of proposed reclamation in the Parks of Coppell as presented in our report. Since our Denton Creek analysis includes constructed projects in the area, we understand that your technical review and approval are qualified pending outcome of the Magnolia Park Project Map Revision request. On behalf of ABQ Development Corporation, please expedite the City review. Our client has authorized us to proceed with preparation of construction plans for the extension of Parkway Boulevard west of the High School Access Road, including the Cottonwood Branch bridge. Roadway grades and the bridge opening design, however, are largely based on flood plain hydraulics and therefore our design efforts are restrained until conditional FEMA and City of Coppell approval of the flood study are received. Please advise me if their is any further information required by the City of Coppell needed to expedite your review. Thank you. Sincerely, Parche ' P E JP: ch cc: Mr. Jay Chester, P.E./ABQ Development Corporation Mr. Ron Morrison, P.E./Kimley Horn and Associates, Inc. 320 ~Vestway Place, Suite 501 · Arlington, Texas 76018 · Metro (817) 467-2418 · (817) 465-0259