Loading...
WA9301-CS 940117COPPELL PUBLIC WORKS MEMORANDUM DATE= January 17, 1994 TO: FROM: RE: Ken Griffin, City Engineer r~~t Steven G. Goram, Director of Public Wor Rate-of-Flow Controller Design/Construction Attached you will find a copy of a letter from Dallas Water Utilities regarding the proposed design and construction of a new rate-of-flow controller for the City of Coppell. Dallas Water Utilities is requesting some information in order to continue with the design and construction of the facility on schedule. Your assistance is greatly appreciated in providing the information called out for in item #2 and #3 in the letter by January 24, 1994. Once I receive this I will forward the requested information to Dallas Water Utilities. I am copying Interim Finance Director Alan Johnson on this memorandum to make him aware of the status. Alan and I are working together to procure the necessary tract of land on Sandy Lake Road from T.R.A. for the purpose of construction. I would like to meet with Alan again to discuss the financial circumstances of this project. I will copy both you and Alan Johnson on any future correspondence regarding this proposed project, and respectfully request that I be copied on correspondence should it be sent directly to either of you. Thank you for your cooperation in this matter. SGG/sm cc: Alan Johnson, Interim Finance Director Attachment r, Jallas ujGTer uTIlITIes City Hall · Dallas, Texas 75277 · 214/670-3146 JAN ]. ,~ '1994j ..~ PUBLIC WORKS Janua~ 10, 1994 Steve Goram Director of Public Works City of Coppell P.O. Box 478 Coppell, Texas 7501 9 Dear Steve: Dallas Water Utilities is proceeding with the design of the proposed rate of flow controlled metering station as you requested in your letter of December 20, 1993 under the following schedule: Complete Design & Advertise Construction Contract: Award Construction Contract: Complete Construction: July 1994 October 1994 June 1995 Currently, Dallas Water Utilities is obtaining the basic on-site survey work for the design from Dallas Public Works Survey Division. Work has also begun on obtaining a 404 permit from the Corps of Engineers. The current estimated cost for construction of the metering facility is $250,000. Funding for the construction contract, in the amount of the contract award, will be needed from Coppell by the construction contract award date of October 1994. The following items are needed from the City of Coppell in order for Dallas Water Utilities to continue with the design and construction of the facility on schedule: Letter from Coppell advising Dallas Water Utilities that the minimum quantity of water it will take through the proposed metering facility is 5 MGD. (This minimum is necessary in order to meet the maximum quantity of 20 MGD.) Coppell's design and construction requirements for a fill area in a flood plain. All construction permits required to be issued by the City of Coppell for construction in the flood plain (needed before construction contract is advertised). A city utility providing Dallas with water purification and distribution, waste water collection and treatment January 10, 1994 Steve Goram Page 2 Steve, this information along with our discussions by telephone may have eliminated the need for a meeting to discuss the project at this time. We are prepared to meet with you at your request. Please call me at 670-5886 and let me know if you want to have a meeting, or if you have any questions. Sincerely, W. David Rybum Manager Wholesale Services pb c: Larry Rivers, Dallas Water Utilities Doug Munnell, Dallas Water Utilities