Creekview Add PD-CS 881028 (4)The City With A Beautiful October 28, 1988 P,O. Box 478 Coppell, Texas 75019 214 - 462 - 0022 Nathan D. Maier Consulting Eng. Three Northpark 8800 N. Central Expwy. Suite 300 Dallas, Texas 75231 Attn: Jean Maier RE: Final Punch List Items for Creekview Jean, the items I ne~d from you are as follows: 1) Landscaping, grading, and erosion protection letter of agreement 2) "As-Builts" 2 - full sets with mylar 2 - full sets with blue lines 3) One year maintenance bond for streets, storm drainage, & utilities 4) Verification of payment for street lights assessment 5) Verification of payment of street sign assessment 6) Verification of payment of 1.5% inspection fee Attached are the punch list items to be completed by the contractors and if you have any questions, please contact me at 462-8495. Sincerely, Steven M. MortOh Chief Developmental Inspector SMM/bb cc: Steve Goram, Director of Public Works Attachment COPPELL PUBLIC WORKS October 27, 1988 FROM: Steven M. Morton, Chief Develolm~ental Inspector Brent BJams, Streets Crewleade~~ Final Punch List for Creekview Addition Below are the final punch list items for Creekview ~x~dition: 1) Hydromulch all drainage easements 2) Install decorative wall & rails 3 ) Irrigation / Landscape medians 4) Grout crack in invert of inlet @ 5 + 24.32 left 5) Grout Line "B-i" to Line "B" connection 6) Grout 18" - 18" to 27" RCP connection Line "B-2" 7) Rout and Seal crack in alley "C" @ 12" transition station 2 + 30+ 8) Rout and Seal cracks in alley "D" 4 + 00 & 0 + 30+ 9) Rout and Seal cracks in alley "B-l" 3 + 00 &'0 + 30+ 10) Finish cutting saw joint on Glendale 13 + 51.28_+ BOA/bb cc: Steve Goram Per Birdsall COPP~.I,T. PUBLIC WO~ October 27, 1988 FROM: Steven M. Morton, Chief Developmental Inspector Howard Pafford, Water Utilities' Foreman'' Final Walk Thru - Creekview I have assigned Tony White and Carl Bass to do the final walk thru on the above mentioned development. Listed below you will find the punch list items that were found in this walk thru. 1) All valve lids need painting Fire Hydrant Valves (red) Main Line Valves (blue) 2) Turn meter loop around on Lot 48 on Glendale Drive 3) Replace meter lid on Lot 39 on Glendale Drive 4) Reflect chan~e of fire hydrant valve location on the corner of Bethel and Penuel on the as-builts 5) Turn meter loop around at Lot 10 on Penuel 6) Move fire hydrant button to corner of street on corner of Asher & Bethel 7) Replace fire hydrant cap and chain on hydrant at Asher &'Bethel 8) Add extension to valve on Southwest corner of Asher & Bethel 9) Manhole invert out of line in the first manhole on the east end of Penuel, off of Bethel 10) Manhole invert not poured pipe to pipe in the first manhole on the east end of Glendale Drive, off of Bethel If you have any questions regarding this matter, please advise. HLP/bb cc: steve Goram, Director of Public Works