Creekview Add PD-CS 881018COPPF. LL PUBLIC WORKS October 18, 1988 FROM: RE: Russell Doyle, City Engineer Steven M. Morton, Chief Developmental Inspector/-~ Creekview / Sanitary Sewer Aerial Crossing & Bill Johnson Russell, this situation with Bill Johnson and Nathan Maier is getting out of hand. The area that was distl~bed in the installation of this crossing was 15'; (7.5' each side of the pipeD. I feel I can hold the contractor responsible for the area that was disturbed and the 5' area down stream where the water is being deflected by the pier. De you feel that Bill Johnson's design requiring an additional 36.5' if of bag wall up stream of the easement is a matter for the Floodplain Administration? Since it will change the natural condition of the creek and is in an area not disturbed by construction or impacted by the crossing. Please a__dv~se, Chief Develop~31~aT Inspector SNl~/bb cc: Steve Goram, Director of Public Works