Loading...
Creekview Add PD-CS 881013 Coppell, Texas 75019 The City With A Beautiful 214-462-0022 October 13, 1988 Nathan D. Maier Consulting Engineers Three Northpark 8800 N. Central Expwy. Suite 300 Dallas, Texas 75231 At,n: Jean Maier RE: Creekview Pre Walk-Thru / Punch List Dear Mrs. Maier The punch list items are as follows: 1) Raise valve in asphalt approach 2) Fix asphalt curb nose and grade median 3) Patch curb @ first left turn 4) South side, first culvert wing separation 5) Clean out culverts 6) Erosion protection 7) Missing toe on all'aprons @ culvert 8) Remove form from all rip rap 9) Regrade - up stream and down stream @ culverts 10) Ashore - grade parkway 11) clean out to high and out of parkway 12) 42" crossing Back fill headway 13) Reseal joint @ Penuel Dr. East 14) Clean out Lot 16 Block B out right-of-way to high 15) End of Bethel- parkway short need to add fill 16) Shiloh - Clean out is out of right-of-way 17) Headwall Lot 60 - 59 Block B - Type B and Wreck Forms 18) Grade all banks to 3:1 at all headwalls 19) Glendale - adjust meter cans 20) Penuel - 18" Type B headwall - wipe headwall & pipe connection 21) meter can ran over 22) Inlet in alley not draining 23) Grade to drain easements where necessary 24) Ail sewer lines will need to be mendrull and jet balled~ 25) Street and fire hydrant stripes and buttons need to be installed If you have any questions, please contact me at 462-8495. Sincerely, Steven M .~_M~gI~~~'~ Ch i e f-~fff~ Land Deve 1 opmen t SMM/bb cc: Steve Goram, Director of Public Works