Loading...
Creekview Add PD-CS 871123 CONSULTING ENGINEERS, INC. November 23, 1987 Mr. Steven Morton Chief of Land Development Public Works Department P.O. Box 478 Coppell, Texas 75019 Re: Creek View Estates NDM No.: 87-5-62 Dear Steve: The following is in response to the Public Works Department's comments October 30, 1987. Land Development 1. We will show the number of lots on the plat. 2. We will delete the brick pavers on the crossing if that is what the City of Coppell wants. They were put there for two reasons: (1) to follow the City's streetscape plan and (2) to provide a different feeling when crossing from the retail site to the residential site. 3. We will coordinate with you on extending the rtprap on both ends of boxes "A", "B", and "Cm. We want to keep the creek as natural as possible, so therefore we feel we should keep the riprap to a minimum. Utilities 1. See attached sheet for sanitary sewer flows from Creekview Estates to existing system. 2. See attached plan of water line crossing at railroad. 3. We will relocate fire hydrant as requested. Parks Department - Landscape irrigator's seal will be provided on irrigation designs and drawings. - 4" sleeves will be provided under paving. Three NorthPark/8800 N. Central Expwy./Suite 300/Dallas, Texas 75231/(214) 739-4741 Mr. Steven Morton November 23, 1987 Page 2 - Electrical source and location will be provided by landscape architect. - The common area in the middle of Bethel Road will be a nicely land- scaped green area. These plans will be submitted to you for review. At this time, they have not been completed. - The Homeowner's Association will be responsible for the power and water utility bills for this area. Signs/Signalization Department We agree to do the five items listed. Should you have any questions, please do not hesitate to call. Sincerely, NATHAN D. MAIER CONSULTING ENGINEERS, INC. J~ah B. Maier, P.E. JBM/rdp cc: Taryon Bowman Planning and Zoning Coordinator