Deer Run-CS 980326 DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM: Deer Run. Preliminary Plat. to allow the development of 54 duplex lots and 3
triplex lots on approximately 9 acres of property, located at the northwest
corner of Ruby and Coppell Roads, at the request of Harrington Engineering,
Inc.
DRC DATE: March 26, 1998 and~4pril 2, 1998
CONTACT: Mike Martin, P.E.,/~ssistant City Engineer (304-3679)
COMMENT STATUS: ,~PRELI. MI~ARY F4NA:I~ ~
1. The existing fight-of-way for Coppell Road and Ruby Road should be verified.
2. Provide a 10'xl0' right-of-way comer clip at all street intersections to provide room of A.D.A.
ramps.
3. All City utility easements must be a minimum of 20'.
4. There needs to be some discussion about the proposed alley access easements.
5. Need to provide pedestrian access (sidewalk) from Archer Drive north to Wilson Elementary
School.
6. Need to show the offset distance from Archer Drive to the alley across the street. Need to have an
offset distance of 125'.
Preliminary Water and Sanitary Sewer Layout
1. Individual water services should be provided for each lot.
2. An 8" water line stub out should be provided in the alley right-of-way between Lots 9A and 8B,
Block 1.
Preliminary Drainage Plan
1. A drainage inlet should be provided in the alley for Block 2 before Arrow Lane.
Screening Wall, Landscape, and Irrigation Plan
1. Show the correct visibility easement triangles as per the City's Subdivision Ordinance.