Deer Run-CS 980730 (2)DEVELOPMENT REVIEW COMMITIEE
ENGINEERING COMMENTS
ITEM: Deer Run. Final Plat. to allow the development of 56 duplex lots on
approximately 9 acres of property, located at the northwest corner of Ruby
and South Coppell Roads, at the request of Harrington Engineering, Inc.
~ DRC D,4TE: Jury 30, 1998 and,4ugust 6, 1998
CONT,4 CT: Mike Martin, P.E., ,4ssistant City Engineer 004-3679)
COMMENT STATUS: ,/PRELIMINARY FtNAg ~
1. Show any existing drives north of property.
2. Any crossings with less than 24" clearance will require concrete encasing.
3. Need to provide paving cross section for all public paving.