Deer Run-CS 981021 (2) FILE
! Coppell, Texas 75019
October 21, ~1998
Mr. James Harrington, P.E.
Harrington Engineering, Inc.
3023 Routh Street
Dallas, Texas 75201
RE:
Development Fee Assessment
Dear Mr. Harrington:
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy
of the Development Fee calculations for the referenced development.
Please make payment to the City of Coppell in the mount of $172,490.00 and forward to the
Finance Department along with a copy of the Fee Assessment table. This amount is a portion
of the assessed fees which need to be paid prior to Council approval. Please refer to attached
table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office
so the construction inspection fee can be verified.
Providing a copy of your paid receipt to the Engineering Department will help us to verify the
payment of required fees and insure a successful beginning of this project. We look forward
to working with you on this project. If you have any questions, please contact me.
Sincerely, 7~
~ Martin, P.E.
Assistant City Engineer
cc: Jennifer Armstrong, Finance Director
Doug Stevens, Engineering Technician
Glenn Hollowell, Assistant Director of Public Works
Greg Jones, Chief Building Official
Gary Sims, Director of Leisure Services
DEVELOPMENT FEE TABLE
Project: DEER RUN
Date: 10/21/98
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $27,450.00 $27,450.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $2,850.00
(100% due at Issuance of Water Meter) ,
Water Meter Fee (Domestic) $1,390.48
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $142.80
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $1,960.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $30.00
(100 % due at Issuance of Water Meter)
Wastewater Impact Fee $25,200.00 $25,200.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $2,800.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $2,800.00
(100% due at Issuance of Building Permit)
Park Fee $71,960.00 $71,960.00
(100% due prior to Council Approval)
Roadway Impact Fee $47,880.00 $47,880.00
(100% due prior to Council Approval)
Street Light Fee Information not
(100% due prior to Acceptance of Project available at this time
Street Sign Fee Information not
(100% due prior to Acceptance of Project available at this time
Construction Inspection Fee Need submittal of
development contracts
TOTAL $184,463.28
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $172,490.00
DEVELOPMENT FEE WORKSHEET
PROJECT: DEER RUN
DATE: 10/21/98
Water Impact Fee:
Domestic Meter(s): 56 - 5/8 inch X 3/4 inch = 56 ESU's
Irrigation Meter(s): I - 1 1/2 inch = 5 ESU's
= ESU's
Fireline Meter(s): = ESU's
Total #: 61 ESU's @ $450.00 ea. $27,450.00
(100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total #: 57 Connections @ $50.00 ea. $2,8,50.00
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #: 56 Domestic Meter(s) @ $24.83 $1,390.48
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
lrrigation/Fireline Water Meter Fee:
Total #: 1 Irrigation Meter(s) @ $142.80 $142.80
Total #: 0 Additional Irrigation Meter(s) @ $0.00
Total #: 0 Fireline Meter(s) @ $0.00
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #: 56 Meter(s) @ $35.00 ea. $1,960.00
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 1 Meter(s) @ $30.00 ea. $30.00
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's: 56 @ $450.00 ea. $25,200.00
Wastewater Tap Inspection Fee:
Total #: 56 Connections @ $50.00 ea. $2,800.00
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 56 Lots @ $50.00 ea. $2,800.00
(100% due prior to issuance of building permit)
Page 1
DEVELOPMENT FEE WORKSHEET
Park Fee (For Residential Developments Only):
* Preliminary plat approved prior to June 23, 1992:
N/A Single-family @ $150.00 / Lot N/A
N/A Multi-family @ $75.00 / Unit N/A
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after June 23, 1992:
N/A Single-family @ $350.00 / Lot N/A
N/A Multi-family @ $350.00 / Unit , N/A
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after October 26, 1993:
56 Single-family @ $1285.00 / Lot $71,960.00
N/A Multi-family @ $1285.00 / Unit N/A
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations) $47,880.00
Street Lighting Fees: Information not
Assessed for lighting in the City's right-of-way, available at this time
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees: Information not
Assessed for signage in the City's right-of-way, available at this time
(See attached fee calculations if applicable)
Construction Inspection Fees: Need submittal of
A copy of the development contract must be submitted for assessment, development contracts
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Page 2
ROADWAY IMPACT FEE CALCULATIONS
PROJECT: DEER RUN
DATE: 10/21/98
ROADWAY IMPACT FF~F~:
Service Area * 4
Category ** Residential
Land Use ** Others / Not Specified (Residential)
Building Size (Sq. Ft.) N/A
Development Units ** 56
Vehicle Miles per Development Unit ** 2.85
Fee per Vehicle Mile *** $300
Roadway Impact Fee due = (Development Units) x
(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $47,880.00
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)