Loading...
Copperstone FS-CS 881007 -//~ The City 't , ' · P,O. Box 478 Coppell, Texas 75019 214 - 462 - OO22 October 7, 1988 Mr. Jerry Parche Parche Consulting Engineers 6001W. Interstate 20 Suite #209, LB 32 Arlington, Texas 76016 RE: Floodplain Reclamation Study/Parkway Boulevard Dear Mr. Parche: I am in receipt of subject submittal, which we will hand carry to F.E.M.A. on Monday. I am operating on the assumption that the design submitted is in compliance with all current ordinances, rules and regulations of the City of Coppell, includinq the Floodplain Ordinance. In the interest of expediting the project, I am passing your submittal onto F.E.M.A., trusting that you have complied with all requirements. In the meantime, please submit three (3) sets of plans and drawings to this office so that we can review the development that your reclamation report represents. We will have the key members of the DRC review those and, if necessary, will ask for a meeting to discuss this matter. (It does appear that you omitted sealing your study). As discussed in detail with you on Tuesday with the DRC, all "grandfathered" documentation shall be submitted to me for consideration of complying with that commitment. Your cooperation and continued assistance in this matter is greatly appreciated. Thank you. |--, .... : I v' i-- 13 0 CT ! 2 1988 Je,,~' i,l,~che Co~,s,,ll n~ [nli'S- RRD/lsg xc: Alan Ratliff, City Manager Wayne Ginn, Ginn, Inc. Steve Goram, Director of Public Works Shohre Daneshmand, Civil Engineer Taryon Bowman, P&Z Coordinator Jay Chester, ABQ Development 0O3