Loading...
Parks Coppell FS-CS 861215 THREAOGILL - DOWDE ~-' ~=~=~[~' * ®[~ & ASSOCIATES 16250 Dallas Parkway, Suite 100 ATTENTION WE ARE SENDING YOU ~ ARach~ ~ Undar sep~at~ co~r via the followin~ items: ~ Shop drawings ~ Prints ~ Plans ~ Samples D Specifications D Copy of le~er n Change order ~ d~ '~ ~,'4o~. [ ~ ~ ' DESCRI~ION COPIES DATE NO. THESE ARE TRANSMITTED as checked below: [] For approval [] Approved as submitted [] Resubmit _copies for approval ~For your use [] Approved as noted [] Submit copies for distribution [] As requested [] Returned for corrections [] Return corrected prints [] For review and comment [] [] FOR BIDS DUE 19__ [] PRINTS RETURNED AFTER LOAN TO US REMARKS SIGNED: If enclosures are not as noted, kindly not/fy us at once. THREADOILL - DOWD. & ASSOCIATES 16250 Dallas Parkway, Suite 100 DALLAS. TEXAS 75248 A~ENTION .~o.e .~-06.~ ~, ~ ~ ~. ~ ~ ~ ~ WE ARE SENDING YOU ffi Aflach~ ~lJ~dcr ::k;,.t~ ~uver v~a -J' the following items: ~ Shop drawings ~ Prints ~ Plans ~ Samples ~ S~cifications ~ Copy of latter ~ Change order COPIES DATE NO. DESCRIPTION THESE ARE TRANSMI~ED as check~ ~low: ~ For approval D Approv~ as submiff~ ~ Resubmit ~pies for approval B For your use B Approv~ as not~ B Submit copies for distribution D As r~uest~ D Return~ for corr~ions D Return ~r~ prints For review a~ comment ~ FOR BIDS DUE ~9~ ~ PRINTS RETURNED A~ER LOAN TO US __ __ copy To ~,'+-.,' ~,.,~ .',. --,.- ~ e,~. oF' c,,~,oo z'/ ,4rf/~. ~::j /~'//e.~/ U.;~'~ C.~. SIGNED: ~Z~3 ~ ~ ~ o~4z~ If e~losums are not a~ n~ed, kindly ~ us PARKS OF COPPELL City of Coppell, Texas ~ " HYDROLOGIC & HYDRAULIC PARAMETERS The hydrologic and hydraulic parameters for this project are those used in a preliminary FIS report and Floodway Map dated November 2, 1982, which subsequently became the revised FIS report and Floodway Map dated February 15, 1984. The HEC-2 models are based on the input data for discharges, section numbers, cross section data and encroach- ment stations of a run by Cawley Gillespie & Asociates, Inc executed June 23, 1982 with a HEC-2 release updated August 1977, modification 53. The current project HEC-2 models were run with a release updated May 1984, modification 56. This difference created only minor water surface differences at the upstream sections, which appear to be cumulative. The models presented are based on the water surfaces and floodway encroachment stations as reflected in the February 15, 1984 report and Floodway Map.