Loading...
WA9302A-CN 970326 - 7 SHIMEK, JACOBS & FINKLEA,. L.L.P. '5 A' CONSULTING ENGINEERS ..................................................8333 Douglas Avenue, #820 Dallas, Texas 75225-5816 Fax (214) 361-0204 Phone (214) 361-7900 ROSS L. JACOBS, P.E. RONALD V. CONWAY, P.E. JOHN W. BIRKHOFF, P.E. JOE R. CARTER, P.E. March 26, 1997 GARY C. HENDRICKS, P.E. I. C. FINKLEA, P.E. North Texas Municipal Construction Co., Inc. 5614 Dyer Str et Dallas, Te~~06 Re: City of Coppell Village Parkway Pump Station Addition Change Order No. 5 Gentlemen: We are enclosing two fully executed originals of Change Order No. 5 to your contract with the City of Coppell, dated January 9, 1996, for the construction of the Village Parkway Pump Station Additions. Change Order No. 5 covers the extra work required to install the pressure points at Moore Road and Coppell Road; install the level transmitter auto switch for the Sandy Lake Road and Deforest Road Lift Stations; and to re- establish the Dallas Water Utilities flow signal from the Sandy Lake Road Pump Meter Station. These originals are for your files. You are hereby directed to proceed with the work covered by this change order. Enclosure cc: t~r. Ken Griffin, P.E. Mr. Larry Davis J:\Coppell\94156XL\const\CO5_LtrF.doc SHIMEK, JACOBS & FINKLEA, L.L.P. CONSULTING ENGINEERS 8333 Douglas Avenue, #820 Dallas, Texas 75225-5816 Fax (214) 361-0204 Phone (214) 361-7900 ROSS L. JACOBS, P.E. RONALD V. CONWAY, P.E. JOHN W. BIRKHOFF, P.E. JOE n. CANTER, P.E. March 21, 1997 GARY C. HENDRICKS, P.E. I. C. FINKLEA, P.E. Mr. Kenneth M. Griffin, P.E. City of Coppell Post Office Box 478 Coppell, Texas 75019 Re: Village Parkway Pump Station Change Order No. 5 Dear Mr. Griffin: We are enclosing five (5) copies of Change Order No. 5 to your contract with North Texas Municipal Construction Co., dated January 9, 1996, for the construction of the Village Parkway Pump Station Addition. Change Order No. 5 covers the extra work required to add the SCADA components as requested by the City. If the change order is acceptable, please have all five copies executed for the City of Coppell and return two copies to our office. We are available to discuss this project further at your convenience. Gary c. He dricks, Enclosure cc: Mr. Matt Cast Mr. Larry Davis SHIMEK, JACOBS & FINKLEA, L.L.P. CONSULTING ENGINEERS 8333 Douglas Avenue, #820 Dallas, Texas 75225-5816 Fax (214) 361-0204 Phone (214) 361-7900 ROSS L. JACOBS, P.E. RONALD V. CONWAY, P.E. JOHN W. BIRKHOFF, P.E. JOE n. CANTER, P.E. March 6, 1997 GARY C. HENDRICKS, P.E. I. C. FINKLEA, P.E. North Texas Municipal Construction Co., Inc. Re: City of Coppell Village Parkway Pump Station Addition Change Order No. 5 Gentlemen: We are enclosing five copies of Change Order No. 5 to your contract with the City of Coppell, dated January 9, 1996, for the construction of the Village Parkway Pump Station Additions. Change Order No. 5 covers the extra work required to install the additional SCADA System components requested by the City. Please sign and return all five copies of the change order to this office. Once the City executes the change order, we will return two copies to you. If you have any questions, please direct them to us. Sincerely yours, Gary C. Hendricks, P.E. Enclosure cc: ~r~ Ken Griffin, P.E. , Larry Davis J:\Coppell\94156~L\const\CO5_Ltr.doc CITY OF COPPELL, TEXAS VILLAGE PARKWAY PUMP STATION ADDITION PROJECT NO. WA-9302 BID NO. Ql195-02 CHANGE ORDER NO. 5 A. INTENT OF CHANGE ORDER The intent of this change order is to modify the provisions of the contract entered into by the City of Coppell, Texas and North Texas Municipal Construction, Inc., 5614 Dyer Street, Dallas, Texas 75206, for construction of the Village Parkway Pump Station Addition, dated January 9, 1996. B. DESCRIPTION OF CHANGE The City of Coppell has requested the following additions or modifications to the SCADA System. The attached proposal from Team Controls more specifically describes the proposed equipment. a) Adding two (2) pressure point nodes at Coppell Road and Moore Road, utilizing existing telephone lines and existing equipment where possible. b) Adding an auto-switch over from the new level transmitter to the existing level transmitters at the Sandy Lake Road and DeForest Lift Stations. The selection of the level transmitters can be made in the field or the SCADA program. e) Adding the Dallas Water Utilities inflow to the new SCADA system by re-installing the existing modem connection to the Sandy Lake Road Pump Station and re-establishing the signal to the existing DWU flow indicator and chart recorder at the Village Parkway Pump Station. This work is to be performed on an hourly basis with a not to exceed amount as indicated in Section C of this change order. C. EFFECT OF CHANGE ON CONTRACT AMOUNT This change will have the following affect on the final contract amount: Original Revised Change Revised Item Contract Contract Order Contract No. Description Units Quantity Quantity unit Price Amount 27 Monitoring Pressure Points at Coppell Road L.S. 0 1 $6,412.00 $6,412.00 and Moore Road using dedicated phone lines and modern communication. 28 Sandy Lake Road & DeForest Road Lift L.S. 0 I 1,260.00 1,260.00 Stations level transmitter auto switch 29 Adding the Dallas Water Utilities inflow to FIr. 0 16 55.00 880' the new SCADA system by re-installing the existing modern connection to the Sandy Lake Road Pump Station and re-establishing the signal to the existing DWU flow indicator and chart recorder at the Village Parkway Pump Station Total Amount of Change $8,552.. ~; ~ ~ Page 1 of 2 City of Coppell , Village Parkway Pump Station Addiuons Change Order No. 5 Original Contract Amount $933,000.00 Amount, Change Order No. 1 (5,000.00) Amount, Change Order No. 2 152,739.00 Amount, Change Order No. 3 18,415.00 Amount, Change Order No. 4 2,991.00 Amount, Change Order No. 5 8,552 Revised Contract Amount $1,110,697.00 D. EFFECT OF CHANGE ON CONTRACT TIMF. The changes identified above has no effect on the revised contract time. Original Contract Time: 300 Calendar Days Calendar Days, Change Order No. 1 0 Calendar Days Calendar Days, Change Order No. 2 60 Calendar Days Calendar Days, Change Order No. 3 0 Calendar Days Calendar Days, Change Order No. 4 30 Calendar Days Calendar Days, Change Order No. 5 30 Calendar Days Revised Contract Time 420 Calendar Days By the signatures below of duly authorized agents, the City of Coppell, Texas and North Texas Municipal Construction Company, Inc., do hereby agr. ee to append this Change Order No. 5 to the original contract between themselves, dated January 9, 1996. City of Coppell, Texas North Texas Municipal Construction Company, Inc.  on ctor Date:///'~ o'~°g"~'~' Date: 9/~0/~ ' Attest: Attest: Page 2 of 2