Loading...
Creekview Add PD-CS 871123 (2)',' '-"' ^" "' CONSULTING ENGINEEI$, INC. November 23. 1987 Planning ~6d Zoning Coordinator ;~'''.. ~/... & CiCy of~oppell ' ~ ,,' / ~: Creek View Estates Dear Tagyon: ~e ~ollowtng ts in response ~o ~he le~er ~rom Xevin Inc., dated November 18, 1987. Final Pla~ Co~en~s 1. A check ~or ~35,50~.00 was sen~ ~o you co~y. ~is was ~or ~he ~ol- low~n8: VaCer Availability (50t) $ 13,090.00 Sewer Availability (50~) 13,090.00 ~a~eg Tap Fee 200.00 Sewer Tap Fee 200.00 Park ~d 8,92~.00 $ 3~,50~.00 2. - 8. ~ese f~ems have been revised and resubmitted. 9.Homeo~er's Associa~ion Agreemen~ was sent ~o ~he City o~ Coppell some ~ime ago. Ve have no~ received any co~en~s on 10. We are working wi~h Carl ~derson and Ci~, Inc., Co satisfy the requirements o~ the City's Comprehensive Floodplain Ordinance. Construction Plans 1. All the plans requested will be sent to the City o£ Coppell if they have hOC already been so. 2. All plans will be sealed by Registered Engineer or Architect. Three NorthPark/8800 M. Central EXpWl;./Su|tt 300/Dallas, Texan 75231/(o14) 739-4741 Hs. Taryon Bowman November 23, 1987 Page 2 ~ 3. We would like to ask for a variance for the median opening on Bethel ~ Road. The subdivision ordinance requires a &20' minl~u~ distance ~ from the intersection. We .are requesting a variance to 265' from Denton Tap-Road. IJe feel that this will be safer for the residents of the subdivision, since there won't be a ~edian cut for the Gene- .[.-. ral Retail site north of Bethel~ltoad. -~. If you have any additional comments, please feel free to give me a call. Slncerely, NATHAN D. NAIER CONSULTINC ENClNEERS, INC. P.Eo J a.~ B. Hater, JBH/rdp Determine the wastewater design flows from Creek View additions: Design Criteria: 1. For SF9 and SF12, use 100 gpcd Assume 3.5 capita/residential lot 2. For General Retail: Use 50% of usable acreage for building area Use 100 SF per person Use 25 gpd/person 3. Peak factor: Use 3.0 for residential/retail The collection system is divided into two drainage basins (per sheet 14 of 20, dated August, 1987, revised October 21, 1987). System No. Connects to existing 8" sewer outfall line to southwest corner of property. 34 residential lots x 350 gpcd/lot - 11,900 gpd 1.3 acres General Retail (not part of Creek View Addition, but sewer stub provided to this area located in the northeast intersection of Denton Tap Road and proposed Bethel Road~ note - 1.3 acres useable property estima- ted due to floodplain). 1.3 ac x 43,560 SF/A¢ x 0.50 - 28,314 SF 28,314 SF x Person x 25 ~pd - 7,100 gpd 100 SF Person System 1 - TOTAL ADF - 19,000 gpd System 1 - PEAK FLOW - 57,000 gpd System No. 2 Connects to existing 12" sewer outfall line to northeast corner of property. 85 Residental Lots x 350 gpcd/lot - 29,750 gpd System 2 TOTAL ADF - 29,750 gpd System 2 PEAK FLOW - 89,250 gpd