From:BWILLIA1@oncor.com
Sent:Tuesday, October 11, 2011 2:37 PM
To:Keith Marvin
Cc:jcumbee1@oncor.com; kvonkoh1@oncor.com; mattkinsey@oncor.com
Subject:RE: ST 99-02 West Sandy Lake Road
Attachments:DSA City of Coppell Sandy Lake Road.doc
Keith,
Attached is a DRAFT Discretionary Service Agreement (DSA) which provides terms and conditions for removal of this line
section.
Call if you have questions.
Thanks,
Bryan Williams, P. E.
Consulting Engineer, TPM
Oncor Electric Delivery Company
115 W. 7th Street
Fort Worth, Texas 76102-7033
P. O. Box 970
Fort Worth, Texas 76101-0970
Tel.: 817.215.6285
Fax.: 817.215.6274
-----Original Message-----
From: Keith Marvin [mailto:kmarvin@coppelltx.gov]
Sent: Wednesday, August 24, 2011 1:32 PM
To: Williams, Bryan; Cumbee, James
Cc: Von Kohn, Keith; Kinsey, Matt
Subject: RE: ST 99-02 West Sandy Lake Road
Bryan,
City council directed us to pursue the removal of the stretch of transmission line from Denton Tap to North Coppell
Road. Let me know what you need from us to work out the details.
Thanks for your assistance.
Keith
1
Keith Marvin, P.E.
Project Engineer
(972) 304-3681
>>> <BWILLIA1@oncor.com> 8/15/2011 3:38 PM >>>
Keith,
Where do we stand with the adjustments to Oncor's Coppell-Apollo 69 kV Line?
Thanks,
Bryan Williams, P. E.
Consulting Engineer, TPM
Oncor Electric Delivery Company
115 W. 7th Street
Fort Worth, Texas 76102-7033
P. O. Box 970
Fort Worth, Texas 76101-0970
Tel.: 817.215.6285
Fax.: 817.215.6274
-----Original Message-----
From: Keith Marvin [mailto:kmarvin@coppelltx.gov]
Sent: Thursday, June 30, 2011 5:24 PM
To: Cumbee, James
Cc: Williams, Bryan; Von Kohn, Keith; Kinsey, Matt
Subject: RE: ST 99-02 West Sandy Lake Road
Thanks Jim. We'll review and provide some feedback in the next few weeks.
Keith Marvin, P.E.
Project Engineer
(972) 304-3681
>>> <jcumbee1@oncor.com> 6/30/2011 5:05 PM >>>
Keith,
I have attached our Oncor Standard Transmission Line Easement for your review. Please contact me with any questions
relating to the easement documentation.
Thanks,
Jim Cumbee
2
817-215-6298
-----Original Message-----
From: Williams, Bryan
Sent: Wednesday, June 29, 2011 2:02 PM
To: Keith Marvin; Cumbee, James
Cc: Von Kohn, Keith; Kinsey, Matt
Subject: RE: ST 99-02 West Sandy Lake Road
Keith Marvin,
Jim Cumbee will send to you an electronic sample of the easement document that Oncor will require for and in
consideration of removing a portion of the transmission line along the south side of Sandy Lake Road. The estimated
cost for removal of the line from Denton Tap to Coppell Road South is $40,000. We look forward to working with the
City of Coppell on this issue.
Thanks,
Bryan Williams, P. E.
Consulting Engineer, TPM
Oncor Electric Delivery Company
115 W. 7th Street
Fort Worth, Texas 76102-7033
P. O. Box 970
Fort Worth, Texas 76101-0970
Tel.: 817.215.6285
Fax.: 817.215.6274
-----Original Message-----
From: Keith Marvin [mailto:kmarvin@coppelltx.gov]
Sent: Thursday, June 02, 2011 5:16 PM
To: Williams, Bryan
Cc: Chris B. Seely
Subject: ST 99-02 West Sandy Lake Road
Bryan,
I sent the below email with the plans attached as a PDF file.
Unfortunately it got kicked back, I assume due to file size. One of our technicians will send you a link to our FTP site
tomorrow where you can download the plan set.
Sorry for the delay.
Keith
Bryan,
3
Thanks for calling me back this morning to discuss our upcoming W. Sandy Lake Road project. I'm attaching a PDF file
with the plan and profile of our current plans.
We have a conflict with Oncor's transmission lines at the east end of the project. There are poles along the South side of
Sandy Lake at approximate stations 109+60, and 107+00 that are in direct conflict with the roadway, and will need to be
relocated.
There are conflicts with the sidewalk at stations 103+00 and 90+50. I will discuss these two locations with the engineer
and see if we can reroute the sidewalk to avoid the conflict on our end.
There is an additional phase of this project that will come shortly after this one that will require the relocation of
additional poles west of this project. We are still working on detailed plans for this future section, but it might be
beneficial to try to do all the relocations as one project.
Our goal is to be prepared to begin construction on this project around the first of the year.
Thanks for your assistance. Please let me know if I can provide any additional information.
Keith
Keith Marvin, P.E.
Project Engineer
(972) 304-3681
Confidentiality Notice: This email message, including any attachments, contains or may contain confidential information
intended only for the addressee. If you are not an intended recipient of this message, be advised that any reading,
dissemination, forwarding, printing, copying or other use of this message or its attachments is strictly prohibited.
If
you have received this message in error, please notify the sender immediately by reply message and delete this email
message and any attachments from your system.
Confidentiality Notice: This email message, including any attachments, contains or may contain confidential information
intended only for the addressee. If you are not an intended recipient of this message, be advised that any reading,
dissemination, forwarding, printing, copying or other use of this message or its attachments is strictly prohibited.
If
you have received this message in error, please notify the sender immediately by reply message and delete this email
message and any attachments from your system.
4
Confidentiality Notice: This email message, including any attachments, contains or may contain confidential information
intended only for the addressee. If you are not an intended recipient of this message, be advised that any reading,
dissemination, forwarding, printing, copying or other use of this message or its attachments is strictly prohibited. If you
have received this message in error, please notify the sender immediately by reply message and delete this email
message and any attachments from your system.
5