Loading...
Creekview Add PD-CS 871030 COPPELL PUBLIC WORKS October 30, 1987 TO: Planning & Zoning Department FROM: Public Works Department RE: Creekview Development Attached are the comments and fee assessments associated with -the above referenced development, which staff believes are applicable to the project-. If there are any questions and/or comments regarding this matter, please direct those inquiries to the following departments that are affected. Thank you. Public Works Administration. Steve Goram Steven Morton · Water Utilities Carl Bass Parks Richard Diano Streets - Signs/Signalization Per Birdsall- Dana Kamp SGG/bb Attachments Land Development CREEKVIEW / Fees Availability 119 lots @ $220.00 per lot = $26,180.00 FINAL PLAT 50% = $13,090.00 BLDG. PERMIT 50% = $13,090.00 Sewer Availability 119 lots @ $220.00 per lot = $26,180.00 FINAL PLAT 50% = $13,090.00 BLDG. PERMIT 50% = $13,090.00 W~,t.('::r Tap Fee 2 @ $100.00 each. = $200.00 Se~,er Tap Fee 2 @ $100.00 each. = $200.00 Park Fund $75.00 x 119 = $8925.00 Due prior to final plat approval. Street Lights 35 x $292.60 per light = $10,241.00 Due prior to acceptance Street Signs = $2862.88 DUe prior to acceptance COPPELL PUBLIC WORKS MEMORANDUM O~"i ~!×~r 28, 1987 TO: Steven M. Morton, Chief of Land Development FROM: Dana Kamp, Signs/Signals Technician RE: Creekview Addition Signage ']J.:,~ f[ollowing cost estimates involve the signage for the entire Creekview A.,'~': i.t ion ]_ncluding alleys. 'l'i~.~y are as follows: 8 - Stop Signs @ $133.26 each. Includes streets signs, pole, labor,' and hardware. $1066.08 10 - Speed Limits (Streets) @ $82.39 each. Includes .moles, labor, and hardware. $823.90 8 - Speed Limits (Alleys) @ $45.71 each. Includes poles, labor, and hardware. $365.68 4 - No Outlet Signs @ $41.84 each + $23.16. $190.52 3 - Yield Signs @ $66.90. $200.70 Includes poles, labor, and hardware. 18 - Street Signs @ $12.00 each. Includes hardware & labor. $216.00 Total $2862.88 D]..~<,/bb Street Light Assessment for Creek View Subdivision The following assessment is being made in accordance with the City of Coppell. Subdivision Ordinance Appendix A Chapter VI, D. The following figures were supplied by T.P. & L. for estimating this assessment. $292.60 per light for every 200 feet of roadway. Yo~ are being assessed for 7000.0 ft. of roadway, which totals to _~35 lights. $292.60 x 35 lights = $10,241.00. *Before lights are installed contact Public Works - !:teve Coram, Director of Public Works or Per Birdsall, Street Foreman to have lighting plan approved. Land Development CREEKVIEW / Plan & Revision Comments 1) Show number of lots on plat. 2 ) Delete brick pavers at first culvert crossing, east of Denton Tap. 3) Extend rip-rap both ends of box "A .... B .... C". UTILITIES 1) Need flows on sanitary sewer (Creekview to existing system) 2) Need detail of waterline crossing at railroad. 3) Relocate fire hydrant from Lot 9, Block D to Lot 11, Block D. Parks Department CREEKVIEW FINAL PLAT - Co~r~ents A 1-i_censed landscape irrigators seal is requested on all irrigation designs at:Y] drawings. Landscape Plan Sheet 3 of 3 °Provide 4" sleeves under any paving °Identify electrical source and location Cul-de-sac Median Area ~What is to occur in common area in the middle of Bethel Rd. on east side of subdivision? °Need to see landscape & irrigation plans for this area'.'.' °[~%o is responsible for power and water utility bills for the area? SIGNS/ SIGNALIZATION DEPARTMENT CREEKVIEW/ Final Plat Con~nts 1) Shall have at least a 12" s~J~re by 3' deep dirt area at end of median nose at Denton Tap and Bethel for the purpose of installing stop sign. 2) All pavement markings- paint- jiggle bars shall conform to the Coppell Standard Construction details. 3) Shall use white single reflector 6"x6"xl" jiggle bars for turn lanes. (See Coppell Standard Construction details) 4) Shall use yellow single reflector 6"x6"xl" jiggle bars for approach to medians heading west. If stripes are installed, it shall be either Hot Thermoplastic glass beads or Stamark 3m brand. (See Coppell Standard Construction details) 5) Shall have a stop bar applied at Denton Tap and Bethel. Thermoplastic glass heads or Stamark brand. (See Coppell Standard Construction details)