Creekview Add PD-CS 871030 COPPELL PUBLIC WORKS
October 30, 1987
TO: Planning & Zoning Department
FROM: Public Works Department
RE: Creekview Development
Attached are the comments and fee assessments associated with -the
above referenced development, which staff believes are applicable
to the project-.
If there are any questions and/or comments regarding this matter,
please direct those inquiries to the following departments that
are affected. Thank you.
Public Works Administration.
Steve Goram
Steven Morton ·
Water Utilities
Carl Bass
Parks
Richard Diano
Streets - Signs/Signalization
Per Birdsall-
Dana Kamp
SGG/bb
Attachments
Land Development
CREEKVIEW / Fees
Availability 119 lots @ $220.00 per lot = $26,180.00
FINAL PLAT 50% = $13,090.00
BLDG. PERMIT 50% = $13,090.00
Sewer Availability 119 lots @ $220.00 per lot = $26,180.00
FINAL PLAT 50% = $13,090.00
BLDG. PERMIT 50% = $13,090.00
W~,t.('::r Tap Fee 2 @ $100.00 each. = $200.00
Se~,er Tap Fee 2 @ $100.00 each. = $200.00
Park Fund $75.00 x 119 = $8925.00
Due prior to final plat approval.
Street Lights 35 x $292.60 per light = $10,241.00
Due prior to acceptance
Street Signs = $2862.88
DUe prior to acceptance
COPPELL PUBLIC WORKS
MEMORANDUM
O~"i ~!×~r 28, 1987
TO: Steven M. Morton, Chief of Land Development
FROM: Dana Kamp, Signs/Signals Technician
RE: Creekview Addition Signage
']J.:,~ f[ollowing cost estimates involve the signage for the entire Creekview
A.,'~': i.t ion ]_ncluding alleys.
'l'i~.~y are as follows:
8 - Stop Signs @ $133.26 each.
Includes streets signs, pole, labor,' and hardware. $1066.08
10 - Speed Limits (Streets) @ $82.39 each.
Includes .moles, labor, and hardware. $823.90
8 - Speed Limits (Alleys) @ $45.71 each.
Includes poles, labor, and hardware. $365.68
4 - No Outlet Signs @ $41.84 each + $23.16. $190.52
3 - Yield Signs @ $66.90. $200.70
Includes poles, labor, and hardware.
18 - Street Signs @ $12.00 each.
Includes hardware & labor. $216.00
Total $2862.88
D]..~<,/bb
Street Light Assessment
for Creek View Subdivision
The following assessment is being made in accordance with the
City of Coppell. Subdivision Ordinance Appendix A Chapter VI,
D. The following figures were supplied by T.P. & L. for
estimating this assessment.
$292.60 per light for every 200 feet of roadway.
Yo~ are being assessed for 7000.0 ft. of roadway, which totals
to _~35 lights.
$292.60 x 35 lights = $10,241.00.
*Before lights are installed contact Public Works -
!:teve Coram, Director of Public Works or Per Birdsall, Street Foreman
to have lighting plan approved.
Land Development
CREEKVIEW / Plan & Revision Comments
1) Show number of lots on plat.
2 ) Delete brick pavers at first culvert crossing, east of Denton Tap.
3) Extend rip-rap both ends of box "A .... B .... C".
UTILITIES
1) Need flows on sanitary sewer (Creekview to existing system)
2) Need detail of waterline crossing at railroad.
3) Relocate fire hydrant from Lot 9, Block D to Lot 11, Block D.
Parks Department
CREEKVIEW FINAL PLAT - Co~r~ents
A 1-i_censed landscape irrigators seal is requested on all irrigation designs
at:Y] drawings.
Landscape Plan
Sheet 3 of 3
°Provide 4" sleeves under any paving
°Identify electrical source and location
Cul-de-sac Median Area
~What is to occur in common area in the middle of Bethel Rd. on east side
of subdivision?
°Need to see landscape & irrigation plans for this area'.'.'
°[~%o is responsible for power and water utility bills for the area?
SIGNS/ SIGNALIZATION DEPARTMENT
CREEKVIEW/ Final Plat Con~nts
1) Shall have at least a 12" s~J~re by 3' deep dirt area at end of median
nose at Denton Tap and Bethel for the purpose of installing stop sign.
2) All pavement markings- paint- jiggle bars shall conform to the Coppell
Standard Construction details.
3) Shall use white single reflector 6"x6"xl" jiggle bars for turn lanes.
(See Coppell Standard Construction details)
4) Shall use yellow single reflector 6"x6"xl" jiggle bars for approach to
medians heading west. If stripes are installed, it shall be either Hot
Thermoplastic glass beads or Stamark 3m brand.
(See Coppell Standard Construction details)
5) Shall have a stop bar applied at Denton Tap and Bethel. Thermoplastic
glass heads or Stamark brand.
(See Coppell Standard Construction details)