Loading...
ST9902-CS130222 (4) Halie Hernandez From:Casey McBroom <CMcBroom@TNPINC.com> Sent:Friday, February 22, 2013 2:45 PM To:Keith Marvin Subject:RE: Message from "RNP002673503929" Attachments:X-BASE Model (1).pdf Keith It took a little while to get the plans referenced into our drawings correctly, but here is where the line would lay today. I think they need to move the gas line closer to the right of way so it remains outside of the proposed wall. It looks like there are two spots where it might be tight: On the north side of winding hollow, near the storm inlets, and near the catch basin on the right of way at STA 65+15. They will also have to pass beneath the proposed gabion walls, but should be able to get deep enough. Hope this helps. Let me know if you have any questions. Casey McBroom, P.E. Project Engineer 17304 Preston Road, Suite 1340 Dallas, Texas 75252 214.461.9867 Phone 972.900.5733 Mobile 214.461.9864 Fax cmcbroom@tnpinc.com -----Original Message----- From: Keith Marvin [mailto:KMarvin@coppelltx.gov] Sent: Friday, February 22, 2013 1:15 PM To: Casey McBroom Subject: FW: Message from "RNP002673503929" Here you go. Thanks. Keith Marvin, P.E. City of Coppell 972-304-3681 -----Original Message----- From: engineering@coppelltx.org [mailto:engineering@coppelltx.org] Sent: Friday, February 22, 2013 12:14 PM 1 To: Keith Marvin Subject: Message from "RNP002673503929" This E-mail was sent from "RNP002673503929" (Aficio MP C3002). Scan Date: 02.22.2013 13:14:19 (-0500) Queries to: engineering@coppelltx.org 2